ITAC Assessment: UU0122
ITAC logo
ITAC Assessment: UU0122
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Roofing Material
NAICS 326140: Polystyrene Foam Product Manufacturing
SIC 3086: Plastics Foam Products
Sales Range $1
M
to 5
M
# of Employees 60
Plant Area 500,000
ft2
Annual Production 1,250
thousand feet
Production Hrs. Annual 8,736
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $384,394 10,234,800
kWh
Electricity Demand $325,046 24,900
kW-mo/yr
Electricity Fees $239,422 -
Natural Gas $61,018 11,815
MMBtu
TOTAL YEARLY COSTS $1,009,880
RECOMMENDED SAVINGS* $297,736 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $69,707

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $204,798 - - $129,648
-
kW-mo/yr
$75,150 -
02 2.8121: Apply for tax-free status for energy purchases $55,559 $500 - - $55,559 -
03 2.2426: Use waste heat from flue gases to heat space conditioning air $15,162 $26,440 - - - $15,162
-
MMBtu
04 2.4224: Upgrade controls on compressors $7,349 $800 $1,984
52,208
kWh
$3,932
-
kW-mo/yr
$1,434 -
05 2.7135: Install occupancy sensors $6,799 $4,244 $6,799
178,926
kWh
- - -
06 2.2511: Insulate bare equipment $5,324 $11,240 $(-413.9)
10,893
kWh
$(-194.8)
-
kW-mo/yr
$(-71.0) $6,004
-
MMBtu
07 2.4231: Reduce the pressure of compressed air to the minimum required $2,745 - $1,054
27,742
kWh
$1,239
-
kW-mo/yr
$452 -
TOTAL RECOMMENDED $297,736 $43,224 $9,423
269,769
kWh
$134,624
-
kW-mo/yr
$132,524 $21,165
-
MMBtu
TOTAL IMPLEMENTED $69,707 $5,544 $8,783
231,134
kWh
$3,932
-
kW-mo/yr
$56,993 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs