ITAC Assessment: MO0036
ITAC logo
ITAC Assessment: MO0036
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product CORRUGATED BOXES
NAICS
n/a
SIC 2653: Corrugated and Solid Fiber Boxes
Sales Range $10
M
to 50
M
# of Employees 137
Plant Area
n/a
Annual Production 233,637
thousand feet
Production Hrs. Annual 6,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,912 1,626,612
kWh
Natural Gas $98,680 20,443
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,795 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,795

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $4,119 $620 - $4,119
-
MMBtu
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,601 $20 $1,601
35,756
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $925 $250 $925
20,516
kWh
-
04 2.4133: Use most efficient type of electric motors $201 $410 - $201
-
MMBtu
05 2.3191: Use demand controller or load shedder $979 - $979
-
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $367 - $367
7,913
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $380 $1,072 $380
8,499
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $223 - $223
4,982
kWh
-
TOTAL RECOMMENDED $8,795 $2,372 $4,475
77,666
kWh
$4,320
-
MMBtu
TOTAL IMPLEMENTED $8,795 $2,372 $4,475
77,666
kWh
$4,320
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs