Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

344

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous plastics products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WI0454 #01 Y:2003 Utilize higher efficiency lamps and/or ballasts $26,309 $61,875
WI0451 #07 Y:2003 Insulate bare equipment $754 $294
WI0451 #06 Y:2003 Recharge batteries on during off-peak demand periods $2,005 $1,400
WI0451 #05 Y:2003 Install compressor air intakes in coolest locations $7,048 $1,280
WI0451 #04 Y:2003 Analyze flue gas for proper air/fuel ratio $3,486 $500
WI0451 #03 Y:2003 Utilize energy-efficient belts and other improved mechanisms $9,847 $3,433
WI0451 #02 Y:2003 Use reverse osmosis to concentrate material $14,092 $36,000
WI0451 #01 Y:2003 Upgrade controls on compressors $21,502 $30,000
WI0436 #07 Y:2002 Utilize higher efficiency lamps and/or ballasts $119 $34
WI0436 #06 Y:2002 Utilize energy-efficient belts and other improved mechanisms $212 $272
WI0436 #05 Y:2002 Install occupancy sensors $496 $225
WI0436 #04 Y:2002 Install timers and/or thermostats $861 $800
WI0436 #03 Y:2002 Install vinyl strip / high speed / air curtain doors $3,276 $1,424
WI0436 #02 Y:2002 Meter recycled water (to reduce sewer charges) $3,768 $200
WI0436 #01 Y:2002 Use adjustable frequency drive or multiple speed motors on existing system $28,363 $102,600
WI0419 #07 Y:2002 Install occupancy sensors $299 $700
WI0419 #06 Y:2002 Utilize energy-efficient belts and other improved mechanisms $173 -
WI0419 #05 Y:2002 Install / repair insulation on steam lines $424 $39
WI0419 #04 Y:2002 Convert to high volume low pressure (hvlp) paint guns $683 $500
WI0419 #03 Y:2002 Eliminate leaks in inert gas and compressed air lines/ valves $1,475 $60