Assessment Year | 2003 |
---|---|
Principal Product | Compression and Injection-Molded Plastic |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 220 |
Plant Area |
144,000
ft2
|
Annual Production | 15,000,000
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Wisconsin |
View Case Study |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $352,904 | 13,503,890 |
kWh
|
$0.026 |
Electricity Demand | $250,162 | 29,447 |
kW-mo/yr
|
$8.50 |
Electricity Fees | $72,122 | - |
|
- |
Natural Gas | $33,572 | 5,957 |
MMBtu
|
$5.64 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $46,900 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $34,744 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $26,309 | $61,875 |
$15,460
562,170
kWh
|
$10,849
-
kW-mo/yr
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,002 | $24,500 |
$8,002
290,988
kWh
|
- | - | |
03 | 2.4224: Upgrade controls on compressors | $4,154 | $10,500 |
$4,154
151,065
kWh
|
- | - | |
04 | 2.6232: Install set-back timers | $4,115 | $400 | - |
$4,115
-
kW-mo/yr
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $3,128 | $1,980 |
$1,697
61,683
kWh
|
$1,431
-
kW-mo/yr
|
- | |
06 | 2.7261: Install timers and/or thermostats | $1,192 | $1,600 | - | - | $1,192 | |
TOTAL RECOMMENDED | $46,900 | $100,855 |
$29,313
1,065,906
kWh
|
$16,395
-
kW-mo/yr
|
$1,192 | ||
TOTAL IMPLEMENTED | $34,744 | $65,855 |
$17,157
623,853
kWh
|
$16,395
-
kW-mo/yr
|
$1,192 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs