ITAC Assessment: AT0064
ITAC logo
ITAC Assessment: AT0064
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product GASKETS & HOSES
NAICS
n/a
SIC 3053: Gaskets, Packing, and Sealing Devices
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area
n/a
Annual Production 7,700,000
pieces
Production Hrs. Annual 4,080
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $20,582 337,925
kWh
Natural Gas $5,227 834
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,175 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $410

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $107 $108 $107
1,758
kWh
-
02 2.7226: Use computer programs to optimize hvac performance $303 $500 $303
4,982
kWh
-
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,391 $3,000 $4,266
70,047
kWh
$(-1,875.0)
-
MMBtu
04 2.2614: Use cooling tower or economizer to replace chiller cooling $2,374 $4,200 $2,374
38,980
kWh
-
TOTAL RECOMMENDED $5,175 $7,808 $7,050
115,767
kWh
$(-1,875.0)
-
MMBtu
TOTAL IMPLEMENTED $410 $608 $410
6,740
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs