ITAC Assessment: SF0081
ITAC logo
ITAC Assessment: SF0081
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Envelopes
NAICS
n/a
SIC 2677: Envelopes
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 85,000
ft2
Annual Production 1,500,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $253,831 3,878,664
kWh
Electricity Demand $91,460 6,811
kW-mo/yr
Natural Gas $14,213 2,060
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $106,908 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $54,494 $70,794 n/a - - - $54,494
02 2.4133: Use most efficient type of electric motors $1,643 $829 n/a $1,275
19,343
kWh
$368
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $8,669 $20,520 n/a $6,735
102,872
kWh
$1,934
-
kW-mo/yr
- -
04 2.7135: Install occupancy sensors $4,516 $2,200 n/a $3,180
48,945
kWh
$1,336
-
kW-mo/yr
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,904 $1,546 n/a $5,386
82,063
kWh
$1,518
-
kW-mo/yr
- -
06 2.6231: Utilize controls to operate equipment only when needed $2,361 $2,400 n/a $1,110
16,706
kWh
$1,251
-
kW-mo/yr
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $19,669 $26,800 n/a $18,924
288,980
kWh
$745
-
kW-mo/yr
- -
08 2.4239: Eliminate or reduce compressed air usage $3,026 $875 n/a $2,909
44,256
kWh
$117
-
kW-mo/yr
- -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,057 - n/a $1,803
34,291
kWh
$254
-
kW-mo/yr
- -
10 2.4221: Install compressor air intakes in coolest locations $1,492 $225 n/a $654
9,965
kWh
$838
-
kW-mo/yr
- -
11 3.4154: Eliminate leaks in water lines and valves $2,077 $75 n/a $1,131
48,066
kWh
- $946
-
Tgal
-
TOTAL RECOMMENDED $106,908 $126,264 $43,107
695,487
kWh
$8,361
-
kW-mo/yr
$946
-
Tgal
$54,494
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs