Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,601

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Fabricated rubber products, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TR0058 #01 Y:2024 Use solar heat to make electricty $31,832 $216,216
LE0571 #07 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $3,515 $9,473
LE0571 #06 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $97,059 $323,310
LE0571 #05 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $27,724 $80,063
LE0571 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $3,911 $1,560
LE0571 #03 Y:2024 Install occupancy sensors $719 $70
LE0571 #02 Y:2024 Turn off equipment during breaks, reduce operating time $1,674 $140
LE0571 #01 Y:2024 Reduce the pressure of compressed air to the minimum required $737 -
UC2402 #09 Y:2024 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $6,701 $64,088
UC2402 #08 Y:2024 Utilize controls to operate equipment only when needed $1,934 $155
UC2402 #07 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $419 $1,300
UC2402 #06 Y:2024 Utilize controls to operate equipment only when needed $4,612 $30
UC2402 #05 Y:2024 Reduce the pressure of compressed air to the minimum required $2,261 $150
UC2402 #04 Y:2024 Eliminate or reduce compressed air usage $2,943 $1,040
UC2402 #03 Y:2024 Install / repair insulation on steam lines $1,298 $3,327
UC2402 #02 Y:2024 Use battery storage for demand control $7,849 $31,027
UC2402 #01 Y:2024 Use solar heat to make electricty $17,049 $134,289
IC0298 #11 Y:2024 Use optimum size and capacity equipment $2,685 $6,178
IC0298 #10 Y:2024 Insulate bare equipment $18,765 $12,716
IC0298 #09 Y:2024 Insulate bare equipment $259 $259