ITAC Assessment: TR0058
ITAC logo
ITAC Assessment: TR0058
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Custom injection molding for consumer, medical, communications and automotive apps.
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area 170,205
ft2
Annual Production 3,100,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,071 1,501,200
kWh
Electricity Demand $55,571 4,964
kW-mo/yr
Electricity Fees $5,919 -
Waste Disposal Costs
Water Usage $952 799
Tgal
Water Disposal $408 343
Tgal
TOTAL YEARLY COSTS $136,921
RECOMMENDED SAVINGS* $35,672 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings
01 2.9114: Use solar heat to make electricty $31,832 $216,216 $23,226
470,714
kWh
$8,606
-
kW-mo/yr
-
02 2.7232: Replace existing hvac unit with high efficiency model $2,706 $7,350 $2,064
41,839
kWh
$641
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $727 $2,781 $439
8,902
kWh
$287
-
kW-mo/yr
-
04 3.4155: Meter waste water $408 $1,511 - - $408
-
Tgal
TOTAL RECOMMENDED $35,672 $227,858 $25,729
521,455
kWh
$9,535
-
kW-mo/yr
$408
-
Tgal
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs