Assessment Year | 2001 |
---|---|
Principal Product | Automation Equipments |
NAICS |
n/a
|
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
60,000
ft2
|
Annual Production | 30
pieces
|
Production Hrs. Annual | 2,475
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $17,635 | 620,640 |
kWh
|
$0.028 |
Electricity Demand | $35,794 | 2,544 |
kW-mo/yr
|
$14.07 |
Natural Gas | $6,839 | 1,102 |
MMBtu
|
$6.21 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $6,759 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,646 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $2,331 | $200 |
$676
24,131
kWh
|
$1,655
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,820 | $4,275 |
$543
19,409
kWh
|
$1,300
-
kW-mo/yr
|
- | - | - | $(-23.0) | |
03 | 2.7261: Install timers and/or thermostats | $782 | $800 |
$80
936
kWh
|
- |
$702
-
MMBtu
|
- | - | - | |
04 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $765 | $3,000 | - | - | - | - |
$765
-
lb
|
- | |
05 | 3.8132: Use less toxic and volatile solvent substitutes | $533 | $1,200 | - | - | - |
$880
-
gal
|
- | $(-347.0) | |
06 | 2.7243: Improve air circulation with destratification fans / other methods | $528 | $600 | - | - |
$528
-
MMBtu
|
- | - | - | |
TOTAL RECOMMENDED | $6,759 | $10,075 |
$1,299
44,476
kWh
|
$2,955
-
kW-mo/yr
|
$1,230
-
MMBtu
|
$880
-
gal
|
$765
-
lb
|
$(-370.0) | ||
TOTAL IMPLEMENTED | $3,646 | $2,200 |
$756
25,067
kWh
|
$1,655
-
kW-mo/yr
|
$702
-
MMBtu
|
$880
-
gal
|
- | $(-347.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs