Assessment Year | 1997 |
---|---|
Principal Product | Large presision machined metal products |
NAICS |
n/a
|
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
70,000
ft2
|
Annual Production | 0
pieces
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $66,279 | 3,157,093 |
kWh
|
$0.021 |
Electricity Demand | $93,832 | 5,988 |
kW-mo/yr
|
$15.67 |
Natural Gas | $17,917 | 3,096 |
MMBtu
|
$5.79 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $55,850 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $36,283 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Primary Product Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 3.3131: Use evaporation to concentrate material | $5,304 | $14,840 | - | - |
$(-3,371.0)
-
MMBtu
|
$9,675
-
gal
|
$(-1,000.0) | - | - | |
02 | 4.652: Replace existing equipment with more suitable substitutes | $12,472 | $24,000 | - | - |
$4,597
-
MMBtu
|
- | $7,875 | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,380 | $17,325 |
$1,381
65,944
kWh
|
$1,439
-
kW-mo/yr
|
- | - | $560 | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,791 | $3,843 |
$507
24,033
kWh
|
$1,284
-
kW-mo/yr
|
- | - | - | - | - | |
05 | 4.711: Initiate a total quality management program | $26,134 | - | - | - | - | - | $15,000 | $4,320 | $6,814 | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,769 | $80 |
$3,328
153,869
kWh
|
$3,441
-
kW-mo/yr
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $55,850 | $60,088 |
$5,216
243,846
kWh
|
$6,164
-
kW-mo/yr
|
$1,226
-
MMBtu
|
$9,675
-
gal
|
$22,435 | $4,320 | $6,814 | ||
TOTAL IMPLEMENTED | $36,283 | $17,405 |
$4,709
219,813
kWh
|
$4,880
-
kW-mo/yr
|
- | - | $15,560 | $4,320 | $6,814 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Personnel Changes Savings | Primary Product Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs