ITAC Assessment: UD0520
ITAC logo
ITAC Assessment: UD0520
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Large presision machined metal products
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 70,000
ft2
Annual Production 0
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,279 3,157,093
kWh
Electricity Demand $93,832 5,988
kW-mo/yr
Natural Gas $17,917 3,096
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,850 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,283

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Primary Product Savings By-product Production Savings
01 3.3131: Use evaporation to concentrate material $5,304 $14,840 - - $(-3,371.0)
-
MMBtu
$9,675
-
gal
$(-1,000.0) - -
02 4.652: Replace existing equipment with more suitable substitutes $12,472 $24,000 - - $4,597
-
MMBtu
- $7,875 - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,380 $17,325 $1,381
65,944
kWh
$1,439
-
kW-mo/yr
- - $560 - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,791 $3,843 $507
24,033
kWh
$1,284
-
kW-mo/yr
- - - - -
05 4.711: Initiate a total quality management program $26,134 - - - - - $15,000 $4,320 $6,814
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,769 $80 $3,328
153,869
kWh
$3,441
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $55,850 $60,088 $5,216
243,846
kWh
$6,164
-
kW-mo/yr
$1,226
-
MMBtu
$9,675
-
gal
$22,435 $4,320 $6,814
TOTAL IMPLEMENTED $36,283 $17,405 $4,709
219,813
kWh
$4,880
-
kW-mo/yr
- - $15,560 $4,320 $6,814
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Primary Product Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs