ITAC Assessment: MA0395
ITAC logo
ITAC Assessment: MA0395
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product dining furniture
NAICS
n/a
SIC 2512: Wood Household Furniture, Upholstered
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 105,000
ft2
Annual Production 15,000
thousand feet
Production Hrs. Annual 2,250
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $114,079 1,131,887
kWh
Electricity Demand $47,187 4,776
kW-mo/yr
LPG $505 17
MMBtu
Fuel Oil #2 $15,097 3,046
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,267 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,061

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 4.652: Replace existing equipment with more suitable substitutes $8,941 $16,900 $(-202.0)
(-2,931)
kWh
- - $9,143 - -
02 2.1331: Burn a less expensive grade of fuel $440 - - $440
-
MMBtu
- - - -
03 3.5315: Lease / purchase baler; sell cardboard to recycler $20 - - - $1,270
-
lb
$(-1,250.0) - -
04 4.821: Pay bills on time to avoid late fees $1,153 - - - - - $1,153 -
05 2.7135: Install occupancy sensors $888 $992 $888
12,896
kWh
- - - - -
06 3.4145: Use magnetic technology to treat water $825 $5,200 - - - - - $825
TOTAL RECOMMENDED $12,267 $23,092 $686
9,965
kWh
$440
-
MMBtu
$1,270
-
lb
$7,893 $1,153 $825
TOTAL IMPLEMENTED $2,061 $992 $888
12,896
kWh
- $1,270
-
lb
$(-1,250.0) $1,153 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs