Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,615

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Fabricated rubber products, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK0494 #05 Y:1996 Eliminate leaks in inert gas and compressed air lines/ valves $689 $30
OK0494 #04 Y:1996 Repair and eliminate steam leaks $5,851 $3,600
OK0494 #03 Y:1996 Lower light fixtures in high ceiling areas $12,077 $3,040
OK0494 #02 Y:1996 Replace electrically-operated equipment with fossil fuel equipment $24,329 $98,000
OK0494 #01 Y:1996 Purchase high materials in returnable bulk containers $91,927 $31,996
UM0047 #07 Y:1996 Contract a wood pallet recycling company $7,500 -
UM0047 #06 Y:1996 Reuse / recycle/ sell rubber products $38,850 $9,900
UM0047 #05 Y:1996 Use waste heat from flue gases to heat space conditioning air $1,114 $68,940
UM0047 #04 Y:1996 Use synthetic lubricant $471 $256
UM0047 #03 Y:1996 Install compressor air intakes in coolest locations $1,070 $2,000
UM0047 #02 Y:1996 Optimize plant power factor $2,253 $4,880
UM0047 #01 Y:1996 Use most efficient type of electric motors $4,073 $38,100
AM0266 #05 Y:1996 Eliminate/reduce an operation $2,250 $6,600
AM0266 #04 Y:1996 Insulate bare equipment $360 $710
AM0266 #03 Y:1996 Utilize higher efficiency lamps and/or ballasts $375 $185
AM0266 #02 Y:1996 Make a practice of turning off lights when not needed $390 -
AM0266 #01 Y:1996 Eliminate leaks in inert gas and compressed air lines/ valves $2,370 $400
CO0350 #06 Y:1995 Recover waste heat from equipment $290 $610
CO0350 #05 Y:1995 Utilize higher efficiency lamps and/or ballasts $910 -
CO0350 #04 Y:1995 Reduce the pressure of compressed air to the minimum required $870 $30