ITAC Assessment: CO0350
ITAC logo
ITAC Assessment: CO0350
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Latex masks and figures
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 100
Plant Area 25,000
ft2
Annual Production 345,000
lb
Production Hrs. Annual 4,435
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $14,361 174,385
kWh
Natural Gas $13,856 2,852
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,760 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,690

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7442: Keep doors and windows shut when not on use $1,810 - - $1,810
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,580 $290 $1,580
16,999
kWh
- -
03 2.8121: Apply for tax-free status for energy purchases $1,300 $250 - - $1,300
04 2.4231: Reduce the pressure of compressed air to the minimum required $870 $30 $870
9,379
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $910 - $910
14,068
kWh
- -
06 2.2437: Recover waste heat from equipment $290 $610 - $290
-
MMBtu
-
TOTAL RECOMMENDED $6,760 $1,180 $3,360
40,446
kWh
$2,100
-
MMBtu
$1,300
TOTAL IMPLEMENTED $4,690 $540 $1,580
16,999
kWh
$1,810
-
MMBtu
$1,300
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs