Assessment Year | 2013 |
---|---|
Principal Product | High School Students |
NAICS | 611110: Elementary and Secondary Schools |
SIC | 8211: Elementary and Secondary Schools |
Sales Range | less than $500 k |
# of Employees | 340 |
Plant Area |
400,000
ft2
|
Annual Production | 4,000
pieces
|
Production Hrs. Annual | 3,910
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $395,745 | 5,872,280 |
kWh
|
$0.067 |
Electricity Demand | $182,796 | 24,685 |
kW-mo/yr
|
$7.41 |
Electricity Fees | $6,070 | - |
|
- |
Natural Gas | $93,915 | 14,860 |
MMBtu
|
$6.32 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $193,526 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $161,112 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7124: Make a practice of turning off lights when not needed | $79,770 | - |
$29,745
557,000
kWh
|
$50,025
-
kW-mo/yr
|
- | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $18,347 | $26,600 |
$14,984
280,617
kWh
|
$3,363
-
kW-mo/yr
|
- | - | |
03 | 2.3212: Optimize plant power factor | $18,322 | $28,020 | - |
$18,322
-
kW-mo/yr
|
- | - | |
04 | 2.7226: Use computer programs to optimize hvac performance | $15,124 | $200,000 |
$10,234
191,641
kWh
|
$4,890
-
kW-mo/yr
|
- | - | |
05 | 2.1224: Replace boiler | $14,187 | $213,000 | - | - |
$14,187
-
MMBtu
|
- | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,738 | $10,800 |
$6,519
122,080
kWh
|
$2,219
-
kW-mo/yr
|
- | - | |
07 | 2.7111: Reduce illumination to minimum necessary levels | $6,323 | $1,040 |
$3,859
71,569
kWh
|
$2,464
-
kW-mo/yr
|
- | - | |
08 | 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings | $6,079 | $840 |
$3,436
63,347
kWh
|
$2,643
-
kW-mo/yr
|
- | - | |
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,528 | $3,600 |
$4,124
77,236
kWh
|
$1,404
-
kW-mo/yr
|
- | - | |
10 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,965 | $600 |
$1,780
33,380
kWh
|
$1,185
-
kW-mo/yr
|
- | - | |
11 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,400 | $500 | - | - |
$2,400
-
MMBtu
|
- | |
12 | 2.6212: Turn off equipment during breaks, reduce operating time | $2,085 | $20 | - | - |
$2,085
-
MMBtu
|
- | |
13 | 2.4133: Use most efficient type of electric motors | $1,955 | $11,248 |
$1,175
21,980
kWh
|
$780
-
kW-mo/yr
|
- | - | |
14 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,881 | $40 | - | - |
$1,881
-
MMBtu
|
- | |
15 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,537 | - |
$900
16,830
kWh
|
$637
-
kW-mo/yr
|
- | - | |
16 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,130 | $3,780 |
$1,130
21,240
kWh
|
- | - | - | |
17 | 2.7221: Lower temperature during the winter season and vice-versa | $1,378 | - |
$529
9,908
kWh
|
$849
-
kW-mo/yr
|
- | - | |
18 | 2.7211: Clean and maintain refrigerant condensers and towers | $1,016 | $27 |
$1,016
19,032
kWh
|
- | - | - | |
19 | 2.7447: Install vinyl strip / high speed / air curtain doors | $975 | $1,720 |
$657
12,403
kWh
|
$318
-
kW-mo/yr
|
- | - | |
20 | 2.6211: Conserve energy by efficient use of vending machines | $970 | $2,850 |
$970
18,100
kWh
|
- | - | - | |
21 | 3.4151: Minimize water usage | $772 | $460 | - | - | - |
$772
-
Tgal
|
|
22 | 2.4314: Use synthetic lubricant | $660 | - |
$400
7,460
kWh
|
$260
-
kW-mo/yr
|
- | - | |
23 | 2.4231: Reduce the pressure of compressed air to the minimum required | $503 | $10 |
$311
5,820
kWh
|
$192
-
kW-mo/yr
|
- | - | |
24 | 2.7243: Improve air circulation with destratification fans / other methods | $405 | $2,495 |
$127
2,383
kWh
|
$278
-
kW-mo/yr
|
- | - | |
25 | 2.6212: Turn off equipment during breaks, reduce operating time | $306 | - |
$210
3,980
kWh
|
$96
-
kW-mo/yr
|
- | - | |
26 | 2.7124: Make a practice of turning off lights when not needed | $170 | - |
$130
2,520
kWh
|
$40
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $193,526 | $507,650 |
$82,236
1,538,526
kWh
|
$89,965
-
kW-mo/yr
|
$20,553
-
MMBtu
|
$772
-
Tgal
|
||
TOTAL IMPLEMENTED | $161,112 | $474,750 |
$75,607
1,414,927
kWh
|
$68,146
-
kW-mo/yr
|
$16,587
-
MMBtu
|
$772
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs