ITAC Assessment: AS0161
ITAC logo
ITAC Assessment: AS0161
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Paper bags
NAICS
n/a
SIC 2674: Uncoated Paper and Multiwall Bags
Sales Range $10
M
to 50
M
# of Employees 54
Plant Area 40,000
ft2
Annual Production 28,800
ton
Production Hrs. Annual 8,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $147,080 1,985,346
kWh
Natural Gas $7,257 1,466
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,495 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6231: Utilize controls to operate equipment only when needed $9,999 $12,000 $9,999
169,695
kWh
-
02 2.4133: Use most efficient type of electric motors $4,736 $3,648 $4,736
63,892
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,018 $6,288 $2,018
28,722
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,681 $3,268 $1,681
18,757
kWh
-
05 2.7122: Disconnect ballasts $543 $200 $543
7,620
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $112 $210 $112
1,465
kWh
-
07 2.1233: Analyze flue gas for proper air/fuel ratio $205 $300 - $205
-
MMBtu
08 2.2511: Insulate bare equipment $201 $234 - $201
-
MMBtu
TOTAL RECOMMENDED $19,495 $26,148 $19,089
290,151
kWh
$406
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs