ITAC Assessment: MA0559
ITAC logo
ITAC Assessment: MA0559
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Porous plug wrap and tobacco sheet
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $50
M
to 100
M
# of Employees 110
Plant Area 114,000
ft2
Annual Production 11,000
ton
Production Hrs. Annual 8,640
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $996,080 19,211,220
kWh
Electricity Demand $172,555 32,233
kW-mo/yr
Electricity Fees $3,025 -
Fuel Oil #6 $1,032,472 193,500
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $378,650 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,254

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings
01 2.2437: Recover waste heat from equipment $239,059 $699,000 $(-6,348.0)
(-135,350)
kWh
$(-1,358.0)
-
kW-mo/yr
$246,765
-
MMBtu
02 2.4239: Eliminate or reduce compressed air usage $70,580 $123,500 $(-1,857.0)
(-39,600)
kWh
$(-460.0)
-
kW-mo/yr
$72,897
-
MMBtu
03 2.2692: Use outside cold water source as a supply of cooling water $36,905 $15,475 $31,809
678,200
kWh
$5,096
-
kW-mo/yr
-
04 2.2449: Recover heat from exhausted steam, hot air or hot water $16,513 $4,078 - - $16,513
-
MMBtu
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,349 $11,346 $6,332
135,000
kWh
$1,017
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,861 $14,400 $5,914
126,100
kWh
$947
-
kW-mo/yr
-
07 2.2136: Install / repair insulation on steam lines $1,383 $333 - - $1,383
-
MMBtu
TOTAL RECOMMENDED $378,650 $868,132 $35,850
764,350
kWh
$5,242
-
kW-mo/yr
$337,558
-
MMBtu
TOTAL IMPLEMENTED $44,254 $26,821 $38,141
813,200
kWh
$6,113
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs