Assessment Year | 2004 |
---|---|
Principal Product | Porous plug wrap and tobacco sheet |
NAICS | 322121: Paper (except Newsprint) Mills |
SIC | 2621: Paper Mills |
Sales Range | $50 M to 100M |
# of Employees | 110 |
Plant Area |
114,000
ft2
|
Annual Production | 11,000
ton
|
Production Hrs. Annual | 8,640
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $996,080 | 19,211,220 |
kWh
|
$0.052 |
Electricity Demand | $172,555 | 32,233 |
kW-mo/yr
|
$5.35 |
Electricity Fees | $3,025 | - |
|
- |
Fuel Oil #6 | $1,032,472 | 193,500 |
MMBtu
|
$5.34 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $378,650 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $44,254 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #6 Savings |
---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $239,059 | $699,000 |
$(-6,348.0)
(-135,350)
kWh
|
$(-1,358.0)
-
kW-mo/yr
|
$246,765
-
MMBtu
|
|
02 | 2.4239: Eliminate or reduce compressed air usage | $70,580 | $123,500 |
$(-1,857.0)
(-39,600)
kWh
|
$(-460.0)
-
kW-mo/yr
|
$72,897
-
MMBtu
|
|
03 | 2.2692: Use outside cold water source as a supply of cooling water | $36,905 | $15,475 |
$31,809
678,200
kWh
|
$5,096
-
kW-mo/yr
|
- | |
04 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $16,513 | $4,078 | - | - |
$16,513
-
MMBtu
|
|
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,349 | $11,346 |
$6,332
135,000
kWh
|
$1,017
-
kW-mo/yr
|
- | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,861 | $14,400 |
$5,914
126,100
kWh
|
$947
-
kW-mo/yr
|
- | |
07 | 2.2136: Install / repair insulation on steam lines | $1,383 | $333 | - | - |
$1,383
-
MMBtu
|
|
TOTAL RECOMMENDED | $378,650 | $868,132 |
$35,850
764,350
kWh
|
$5,242
-
kW-mo/yr
|
$337,558
-
MMBtu
|
||
TOTAL IMPLEMENTED | $44,254 | $26,821 |
$38,141
813,200
kWh
|
$6,113
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #6 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs