ITAC Assessment: AM0318
ITAC logo
ITAC Assessment: AM0318
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Underground fiberglass fuel storage tanks, fiberglass manhol
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 128,500
ft2
Annual Production 3,500
pieces
Production Hrs. Annual 4,867
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,700 3,542,790
kWh
Electricity Demand $80,665 9,691
kW-mo/yr
Natural Gas $36,775 9,060
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,975 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,480

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Administrative Changes Savings
01 2.2211: Use optimum temperature $11,790 - - - $11,790
-
MMBtu
- -
02 4.231: Purchase equipment instead of leasing $3,110 $5,400 - - - - $3,110
03 2.7124: Make a practice of turning off lights when not needed $2,430 $160 $2,430
83,822
kWh
- - - -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $875 - - $875
-
kW-mo/yr
- - -
05 3.1191: Change procedures / equipment / operating conditions $840 $1,500 - - - $840
-
gal
-
06 2.7145: Install skylights $510 $1,860 $510
17,585
kWh
- - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $420 $100 $420
14,654
kWh
- - - -
TOTAL RECOMMENDED $19,975 $9,020 $3,360
116,061
kWh
$875
-
kW-mo/yr
$11,790
-
MMBtu
$840
-
gal
$3,110
TOTAL IMPLEMENTED $15,480 $1,760 $2,850
98,476
kWh
- $11,790
-
MMBtu
$840
-
gal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs