ITAC Assessment: OK0494
ITAC logo
ITAC Assessment: OK0494
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Mylar and Latex balloons
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 200,000
ft2
Annual Production 28,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $157,946 4,143,904
kWh
Electricity Demand $107,571 9,468
kW-mo/yr
Electricity Fees $8,762 -
Natural Gas $29,990 8,163
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $135,342 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,086

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 3.8314: Purchase high materials in returnable bulk containers $91,927 $31,996 - - - $91,927
-
lb
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $24,329 $98,000 $19,708
368,113
kWh
$9,232
-
kW-mo/yr
$(-4,611.0)
-
MMBtu
-
03 2.7141: Lower light fixtures in high ceiling areas $12,077 $3,040 $12,077
182,884
kWh
- - -
04 2.2135: Repair and eliminate steam leaks $5,851 $3,600 $5,851
142,732
kWh
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $689 $30 $689
11,137
kWh
- - -
06 2.3132: Recharge batteries on during off-peak demand periods $469 $1,000 - $469
-
kW-mo/yr
- -
TOTAL RECOMMENDED $135,342 $137,666 $38,325
704,866
kWh
$9,701
-
kW-mo/yr
$(-4,611.0)
-
MMBtu
$91,927
-
lb
TOTAL IMPLEMENTED $19,086 $7,670 $18,617
336,753
kWh
$469
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs