ITAC Assessment: WV0514
ITAC logo
ITAC Assessment: WV0514
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Motors and Plastics
NAICS 335312: Motor and Generator Manufacturing
SIC 3621: Motors and Generators
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 46,500
ft2
Annual Production 440,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $146,910 2,008,800
kWh
Electricity Demand $53,154 4,998
kW-mo/yr
Natural Gas $52,832 7,478
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,890 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,627

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,361 $688 $3,403
46,550
kWh
$958
-
kW-mo/yr
-
02 2.4322: Use or replace with energy efficient substitutes $4,286 $11,500 $3,350
45,822
kWh
$936
-
kW-mo/yr
-
03 2.4224: Upgrade controls on compressors $3,646 $5,000 $2,848
38,962
kWh
$798
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,801 $15,300 $2,482
33,954
kWh
$1,319
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $1,756 $420 $1,373
18,786
kWh
$383
-
kW-mo/yr
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,663 - $1,301
17,798
kWh
$362
-
kW-mo/yr
-
07 2.4151: Develop a repair/replace policy $1,005 $256 $900
12,314
kWh
$255
-
kW-mo/yr
$(-150.0)
08 2.4231: Reduce the pressure of compressed air to the minimum required $842 $50 $661
9,037
kWh
$181
-
kW-mo/yr
-
09 2.4239: Eliminate or reduce compressed air usage $530 $2,104 $413
5,655
kWh
$117
-
kW-mo/yr
-
TOTAL RECOMMENDED $21,890 $35,318 $16,731
228,878
kWh
$5,309
-
kW-mo/yr
$(-150.0)
TOTAL IMPLEMENTED $9,627 $1,414 $7,638
104,485
kWh
$2,139
-
kW-mo/yr
$(-150.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs