ITAC Assessment: AM0266
ITAC logo
ITAC Assessment: AM0266
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Bridge & slide bearings
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 50,000
ft2
Annual Production 72,000
pieces
Production Hrs. Annual 5,481
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,327 1,662,954
kWh
Electricity Demand $41,323 4,938
kW-mo/yr
Natural Gas $41,509 11,062
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,745 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,745

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,370 $400 $2,370
91,149
kWh
- - -
02 2.7124: Make a practice of turning off lights when not needed $390 - $390
15,533
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $375 $185 $110
4,103
kWh
$265
-
kW-mo/yr
- -
04 2.2511: Insulate bare equipment $360 $710 - - $360
-
MMBtu
-
05 3.1161: Eliminate/reduce an operation $2,250 $6,600 - - - $2,250
-
lb
TOTAL RECOMMENDED $5,745 $7,895 $2,870
110,785
kWh
$265
-
kW-mo/yr
$360
-
MMBtu
$2,250
-
lb
TOTAL IMPLEMENTED $5,745 $7,895 $2,870
110,785
kWh
$265
-
kW-mo/yr
$360
-
MMBtu
$2,250
-
lb
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs