Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

67

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Fabricated rubber products, not elsewhere
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK1135 #06 Y:2024 Use computer programs to optimize hvac performance $37,433 $57,225
OK1135 #05 Y:2024 Turn off equipment when not in use $4,317 -
OK1135 #04 Y:2024 Conserve energy by efficient use of vending machines $682 $630
OK1135 #03 Y:2024 Reduce the pressure of compressed air to the minimum required $889 -
OK1135 #02 Y:2024 Optimize plant power factor $684 $4,416
OK1135 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $2,669 $11,412
OK1061 #04 Y:2021 Optimize plant power factor $916 $3,000
OK1061 #03 Y:2021 Replace existing hvac unit with high efficiency model $5,272 $10,969
OK1061 #02 Y:2021 Reduce the pressure of compressed air to the minimum required $995 -
OK1061 #01 Y:2021 Utilize higher efficiency lamps and/or ballasts $7,581 $11,349
OK0685 #07 Y:2004 Use waste heat from hot flue gases to preheat $22,698 $1,250
OK0685 #06 Y:2004 Eliminate or reduce compressed air usage $6,053 $2,023
OK0685 #05 Y:2004 Insulate bare equipment $11,632 $6,246
OK0685 #04 Y:2004 Insulate bare equipment $9,972 $3,312
OK0685 #03 Y:2004 Insulate bare equipment $23,175 $1,573
OK0685 #02 Y:2004 Preheat combustion air with waste heat $10,694 $34,154
OK0685 #01 Y:2004 Use most efficient type of electric motors $265,308 $559,374
OK0658 #10 Y:2003 Reduce temperature of process equipment when on standby $7,445 -
OK0658 #09 Y:2003 Install occupancy sensors $6,270 $2,004
OK0658 #08 Y:2003 Utilize higher efficiency lamps and/or ballasts $5,609 $30,876