67
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OK1135 #06 Y:2024 | 06 | 2024 | Use computer programs to optimize hvac performance | $37,433 | $57,225 | |
| OK1135 #05 Y:2024 | 05 | 2024 | Turn off equipment when not in use | $4,317 | - | |
| OK1135 #04 Y:2024 | 04 | 2024 | Conserve energy by efficient use of vending machines | $682 | $630 | |
| OK1135 #03 Y:2024 | 03 | 2024 | Reduce the pressure of compressed air to the minimum required | $889 | - | |
| OK1135 #02 Y:2024 | 02 | 2024 | Optimize plant power factor | $684 | $4,416 | |
| OK1135 #01 Y:2024 | 01 | 2024 | Utilize higher efficiency lamps and/or ballasts | $2,669 | $11,412 | |
| OK1061 #04 Y:2021 | 04 | 2021 | Optimize plant power factor | $916 | $3,000 | |
| OK1061 #03 Y:2021 | 03 | 2021 | Replace existing hvac unit with high efficiency model | $5,272 | $10,969 | |
| OK1061 #02 Y:2021 | 02 | 2021 | Reduce the pressure of compressed air to the minimum required | $995 | - | |
| OK1061 #01 Y:2021 | 01 | 2021 | Utilize higher efficiency lamps and/or ballasts | $7,581 | $11,349 | |
| OK0685 #07 Y:2004 | 07 | 2004 | Use waste heat from hot flue gases to preheat | $22,698 | $1,250 | |
| OK0685 #06 Y:2004 | 06 | 2004 | Eliminate or reduce compressed air usage | $6,053 | $2,023 | |
| OK0685 #05 Y:2004 | 05 | 2004 | Insulate bare equipment | $11,632 | $6,246 | |
| OK0685 #04 Y:2004 | 04 | 2004 | Insulate bare equipment | $9,972 | $3,312 | |
| OK0685 #03 Y:2004 | 03 | 2004 | Insulate bare equipment | $23,175 | $1,573 | |
| OK0685 #02 Y:2004 | 02 | 2004 | Preheat combustion air with waste heat | $10,694 | $34,154 | |
| OK0685 #01 Y:2004 | 01 | 2004 | Use most efficient type of electric motors | $265,308 | $559,374 | |
| OK0658 #10 Y:2003 | 10 | 2003 | Reduce temperature of process equipment when on standby | $7,445 | - | |
| OK0658 #09 Y:2003 | 09 | 2003 | Install occupancy sensors | $6,270 | $2,004 | |
| OK0658 #08 Y:2003 | 08 | 2003 | Utilize higher efficiency lamps and/or ballasts | $5,609 | $30,876 |