Assessment Year | 2021 |
---|---|
Principal Product | Fabricated Rubber Products |
NAICS | 326299: All Other Rubber Product Manufacturing |
SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 48 |
Plant Area |
30,000
ft2
|
Annual Production | 300,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $147,629 | 1,677,600 |
kWh
|
$0.088 | |
Electricity Fees | $708 | - |
|
- | |
Waste Disposal Costs | |||||
Water Usage | $1,517 | 316 |
Tgal
|
$4.80 | |
TOTAL YEARLY COSTS | $149,854 | ||||
RECOMMENDED SAVINGS* | $14,764 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,581 | $11,349 |
$7,581
86,149
kWh
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $995 | - |
$995
11,312
kWh
|
- | |
03 | 2.7232: Replace existing hvac unit with high efficiency model | $5,272 | $10,969 |
$5,272
59,904
kWh
|
- | |
04 | 2.3212: Optimize plant power factor | $916 | $3,000 | - | $916 | |
TOTAL RECOMMENDED | $14,764 | $25,318 |
$13,848
157,365
kWh
|
$916 | ||
TOTAL IMPLEMENTED | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs