ITAC Assessment: OK0685
ITAC logo
ITAC Assessment: OK0685
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Automotive door seal
NAICS 326299: All Other Rubber Product Manufacturing
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 430
Plant Area 250,000
ft2
Annual Production 25
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $671,394 18,770,400
kWh
Electricity Demand $309,933 42,717
kW-mo/yr
Electricity Fees $2,673 -
Natural Gas $155,255 33,057
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $349,532 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $315,202

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Increase in Production Savings
01 2.4133: Use most efficient type of electric motors $265,308 $559,374 $15,687
40,021
kWh
$5,797
-
kW-mo/yr
- $99,199 $144,625
02 2.2442: Preheat combustion air with waste heat $10,694 $34,154 - - $10,694
-
MMBtu
- -
03 2.2511: Insulate bare equipment $23,175 $1,573 $16,922
472,674
kWh
$6,253
-
kW-mo/yr
- - -
04 2.2511: Insulate bare equipment $9,972 $3,312 $7,282
203,399
kWh
$2,690
-
kW-mo/yr
- - -
05 2.2511: Insulate bare equipment $11,632 $6,246 $8,493
237,243
kWh
$3,139
-
kW-mo/yr
- - -
06 2.4239: Eliminate or reduce compressed air usage $6,053 $2,023 $6,053
167,936
kWh
- - - -
07 2.2414: Use waste heat from hot flue gases to preheat $22,698 $1,250 $22,698
629,735
kWh
- - - -
TOTAL RECOMMENDED $349,532 $607,932 $77,135
1,751,008
kWh
$17,879
-
kW-mo/yr
$10,694
-
MMBtu
$99,199 $144,625
TOTAL IMPLEMENTED $315,202 $600,436 $45,944
884,030
kWh
$14,740
-
kW-mo/yr
$10,694
-
MMBtu
$99,199 $144,625
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs