Assessment Year | 2004 |
---|---|
Principal Product | Automotive door seal |
NAICS | 326299: All Other Rubber Product Manufacturing |
SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 430 |
Plant Area |
250,000
ft2
|
Annual Production | 25
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $671,394 | 18,770,400 |
kWh
|
$0.036 |
Electricity Demand | $309,933 | 42,717 |
kW-mo/yr
|
$7.26 |
Electricity Fees | $2,673 | - |
|
- |
Natural Gas | $155,255 | 33,057 |
MMBtu
|
$4.70 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $349,532 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $315,202 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $265,308 | $559,374 |
$15,687
40,021
kWh
|
$5,797
-
kW-mo/yr
|
- | $99,199 | $144,625 | |
02 | 2.2442: Preheat combustion air with waste heat | $10,694 | $34,154 | - | - |
$10,694
-
MMBtu
|
- | - | |
03 | 2.2511: Insulate bare equipment | $23,175 | $1,573 |
$16,922
472,674
kWh
|
$6,253
-
kW-mo/yr
|
- | - | - | |
04 | 2.2511: Insulate bare equipment | $9,972 | $3,312 |
$7,282
203,399
kWh
|
$2,690
-
kW-mo/yr
|
- | - | - | |
05 | 2.2511: Insulate bare equipment | $11,632 | $6,246 |
$8,493
237,243
kWh
|
$3,139
-
kW-mo/yr
|
- | - | - | |
06 | 2.4239: Eliminate or reduce compressed air usage | $6,053 | $2,023 |
$6,053
167,936
kWh
|
- | - | - | - | |
07 | 2.2414: Use waste heat from hot flue gases to preheat | $22,698 | $1,250 |
$22,698
629,735
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $349,532 | $607,932 |
$77,135
1,751,008
kWh
|
$17,879
-
kW-mo/yr
|
$10,694
-
MMBtu
|
$99,199 | $144,625 | ||
TOTAL IMPLEMENTED | $315,202 | $600,436 |
$45,944
884,030
kWh
|
$14,740
-
kW-mo/yr
|
$10,694
-
MMBtu
|
$99,199 | $144,625 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs