ITAC Assessment: OD0054
ITAC logo
ITAC Assessment: OD0054
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Electronic Components
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 500
Plant Area 185,000
ft2
Annual Production 200,000
pieces
Production Hrs. Annual 4,080
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $180,465 10,209,555
kWh
Electricity Demand $286,664 21,545
kW-mo/yr
Electricity Fees $234,170 -
Natural Gas $121,489 35,387
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $87,147 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,719

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,378 $6,136 $9,378
136,577
kWh
- - - -
02 2.2612: Use cooling tower water instead of refrigeration $24,554 $66,950 $24,554
362,251
kWh
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $14,848 $8,027 $4,533
256,155
kWh
$10,315
-
kW-mo/yr
- - -
04 2.4133: Use most efficient type of electric motors $2,690 $2,976 $886
50,117
kWh
$1,804
-
kW-mo/yr
- - -
05 2.4131: Size electric motors for peak operating efficiency $8,786 $1,296 $4,329
244,725
kWh
$4,457
-
kW-mo/yr
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $465 $400 $465
26,377
kWh
- - - -
07 2.1233: Analyze flue gas for proper air/fuel ratio $1,400 $500 - - $1,400
-
MMBtu
- -
08 2.2414: Use waste heat from hot flue gases to preheat $9,088 $7,873 - - $9,088
-
MMBtu
- -
09 3.6192: Use a less expensive method of waste removal $15,938 - - - - $1,200
-
lb
$14,738
-
lb
TOTAL RECOMMENDED $87,147 $94,158 $44,145
1,076,202
kWh
$16,576
-
kW-mo/yr
$10,488
-
MMBtu
$1,200
-
lb
$14,738
-
lb
TOTAL IMPLEMENTED $22,719 $11,308 $15,058
457,796
kWh
$6,261
-
kW-mo/yr
$1,400
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs