Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

315

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous products of petroleum and coal
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LS2405 #06 Y:2023 Use fossil fuel powered generator during peak demand periods $129,015 $600,000
LS2405 #05 Y:2023 Replace existing equipment with more suitable substitutes $155,225 $550,000
LS2405 #04 Y:2023 Utilize higher efficiency lamps and/or ballasts $44,207 $25,301
LS2405 #03 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $1,417 $135
LS2405 #02 Y:2023 Reduce the pressure of compressed air to the minimum required $11,023 $50
LS2405 #01 Y:2023 Clean and maintain refrigerant condensers and towers $3,278 -
OK1081 #08 Y:2022 Optimize plant power factor $3,920 $4,024
OK1081 #07 Y:2022 Analyze flue gas for proper air/fuel ratio $4,263 $600
OK1081 #06 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $13,097 $11,114
OK1081 #05 Y:2022 Install outside air damper / economizer on hvac unit $8,026 $7,020
OK1081 #04 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $4,300 $1,230
OK1081 #03 Y:2022 Use solar heat to make electricty $15,617 $218,400
OK1081 #02 Y:2022 Apply for tax-free status for energy purchases $10,608 -
OK1081 #01 Y:2022 Install occupancy sensors $15,211 $2,252
UD1045 #10 Y:2022 Use waste heat from hot flue gases to preheat $3,319 $15,000
UD1045 #09 Y:2022 Utilize higher efficiency lamps and/or ballasts $18,617 $32,900
UD1045 #08 Y:2022 Utilize higher efficiency lamps and/or ballasts $3,184 $2,200
UD1045 #07 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $45,938 $35,826
UD1045 #06 Y:2022 Recover waste heat from equipment $720 $1,000
UD1045 #05 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $11,284 $453