ITAC Assessment: UA3008
ITAC logo
ITAC Assessment: UA3008
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Consumer Oil Products
NAICS 324191: Petroleum Lubricating Oil and Grease Manufacturing
SIC 2992: Lubricating Oils and Greases
Sales Range less than $500
k
# of Employees 38
Plant Area 200,000
ft2
Annual Production 8,000
Tgal
Production Hrs. Annual 4,160
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $130,058 1,332,707
kWh
Electricity Demand $40,993 4,650
kW-mo/yr
Natural Gas $131,621 12,647
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,872 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,177

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2135: Repair and eliminate steam leaks $6,109 $337 - - $6,109
-
MMBtu
02 2.1113: Reduce combustion air flow to optimum $5,598 $17,500 - - $5,598
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $3,470 $2,149 - - $3,470
-
MMBtu
04 2.7231: Use radiant heater for spot heating $12,090 $20,526 - - $12,090
-
MMBtu
05 2.7261: Install timers and/or thermostats $497 $340 $497
8,404
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $2,485 $640 $1,185
19,277
kWh
$1,300
-
kW-mo/yr
-
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,619 $1,500 $1,069
15,211
kWh
$550
-
kW-mo/yr
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $8,004 $16,161 $5,880
83,645
kWh
$2,124
-
kW-mo/yr
-
TOTAL RECOMMENDED $39,872 $59,153 $8,631
126,537
kWh
$3,974
-
kW-mo/yr
$27,267
-
MMBtu
TOTAL IMPLEMENTED $15,177 $19,986 - - $15,177
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs