| Assessment Year | 2010 |
|---|---|
| Principal Product | Consumer Oil Products |
| NAICS | 324191: Petroleum Lubricating Oil and Grease Manufacturing |
| SIC | 2992: Lubricating Oils and Greases |
| Sales Range | less than $500 k |
| # of Employees | 38 |
| Plant Area |
200,000
ft2
|
| Annual Production | 8,000
Tgal
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Alabama |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $130,058 | 1,332,707 |
kWh
|
$0.098 |
| Electricity Demand | $40,993 | 4,650 |
kW-mo/yr
|
$8.82 |
| Natural Gas | $131,621 | 12,647 |
MMBtu
|
$10.41 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $39,872 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $15,177 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2135: Repair and eliminate steam leaks | $6,109 | $337 | - | - |
$6,109
-
MMBtu
|
|
| 02 | 2.1113: Reduce combustion air flow to optimum | $5,598 | $17,500 | - | - |
$5,598
-
MMBtu
|
|
| 03 | 2.2136: Install / repair insulation on steam lines | $3,470 | $2,149 | - | - |
$3,470
-
MMBtu
|
|
| 04 | 2.7231: Use radiant heater for spot heating | $12,090 | $20,526 | - | - |
$12,090
-
MMBtu
|
|
| 05 | 2.7261: Install timers and/or thermostats | $497 | $340 |
$497
8,404
kWh
|
- | - | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,485 | $640 |
$1,185
19,277
kWh
|
$1,300
-
kW-mo/yr
|
- | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,619 | $1,500 |
$1,069
15,211
kWh
|
$550
-
kW-mo/yr
|
- | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,004 | $16,161 |
$5,880
83,645
kWh
|
$2,124
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $39,872 | $59,153 |
$8,631
126,537
kWh
|
$3,974
-
kW-mo/yr
|
$27,267
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $15,177 | $19,986 | - | - |
$15,177
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs