ITAC Assessment: SF0212
ITAC logo
ITAC Assessment: SF0212
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Wire Bonding Tools
NAICS
n/a
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $10
M
to 50
M
# of Employees 190
Plant Area 25,000
ft2
Annual Production 6,900,000
pieces
Production Hrs. Annual 7,344
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $176,492 2,051,200
kWh
Natural Gas $6,025 838
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,406 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,061

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $847 $1,513 $847
9,873
kWh
-
02 2.7135: Install occupancy sensors $261 $600 $261
3,040
kWh
-
03 2.2511: Insulate bare equipment $422 $1,536 $422
6,026
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $953 $4,666 $953
11,100
kWh
-
05 2.7264: Interlock heating and air conditioning systems to prevent simultaneous operation $18,923 $15,000 - $18,923
TOTAL RECOMMENDED $21,406 $23,315 $2,483
30,039
kWh
$18,923
TOTAL IMPLEMENTED $2,061 $6,779 $2,061
24,013
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs