ITAC Assessment: WV0287
ITAC logo
ITAC Assessment: WV0287
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Rubber Products
NAICS 326291: Rubber Product Manufacturing for Mechanical Use
SIC 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods
Sales Range $5
M
to 10
M
# of Employees 72
Plant Area 60,000
ft2
Annual Production 2,600,000
lb
Production Hrs. Annual 4,992
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $199,274 2,751,000
kWh
Electricity Demand $49,437 7,424
kW-mo/yr
Electricity Fees $2,953 -
Natural Gas $43,217 4,113
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,440 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,136

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.2511: Insulate bare equipment $9,905 $479 $6,440
87,607
kWh
$1,405
-
kW-mo/yr
$2,060
-
MMBtu
-
02 2.6215: Shut off air conditioning in winter heating season $9,585 - - - $9,585
-
MMBtu
-
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $8,944 - - $8,944
-
kW-mo/yr
- -
04 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $6,353 $700 $5,710
77,645
kWh
$1,243
-
kW-mo/yr
- $(-600.0)
05 2.4239: Eliminate or reduce compressed air usage $3,278 $280 $2,692
36,691
kWh
$586
-
kW-mo/yr
- -
06 2.2511: Insulate bare equipment $2,932 $97 - - $2,932
-
MMBtu
-
07 2.1133: Adjust burners for efficient operation $2,860 $250 $2,348
32,064
kWh
$512
-
kW-mo/yr
- -
08 2.2414: Use waste heat from hot flue gases to preheat $2,091 $1,770 - - $2,091
-
MMBtu
-
09 2.1233: Analyze flue gas for proper air/fuel ratio $1,482 $1,000 - - $1,482
-
MMBtu
-
10 2.7142: Utilize higher efficiency lamps and/or ballasts $906 - $744
10,104
kWh
$162
-
kW-mo/yr
- -
11 2.4231: Reduce the pressure of compressed air to the minimum required $754 $50 $619
8,422
kWh
$135
-
kW-mo/yr
- -
12 2.4221: Install compressor air intakes in coolest locations $350 $200 $287
3,910
kWh
$63
-
kW-mo/yr
- -
TOTAL RECOMMENDED $49,440 $4,826 $18,840
256,443
kWh
$13,050
-
kW-mo/yr
$18,150
-
MMBtu
$(-600.0)
TOTAL IMPLEMENTED $34,136 $2,576 $15,861
215,842
kWh
$12,401
-
kW-mo/yr
$6,474
-
MMBtu
$(-600.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs