Assessment Year | 2019 |
---|---|
Principal Product | Industrial Oils |
NAICS | 324191: Petroleum Lubricating Oil and Grease Manufacturing |
SIC | 2992: Lubricating Oils and Greases |
Sales Range | $500 k to 1M |
# of Employees | 30 |
Plant Area |
25,000
ft2
|
Annual Production | 10,000
units
|
Production Hrs. Annual | 2,625
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $30,730 | 256,282 |
kWh
|
$0.12 | |
Electricity Demand | $4,614 | 672 |
kW-mo/yr
|
$6.87 | |
Electricity Fees | $1,547 | - |
|
- | |
Natural Gas | $59,360 | 10,219 |
MMBtu
|
$5.81 | |
Waste Disposal Costs | |||||
Water Usage | $2,298 | 269 |
Tgal
|
$8.53 | |
TOTAL YEARLY COSTS | $98,549 | ||||
RECOMMENDED SAVINGS* | $33,906 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $14,090 | $69,698 |
$14,090
130,305
kWh
|
- | - | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $8,792 | $16,000 | - | - |
$8,792
-
MMBtu
|
|
03 | 2.7241: Install outside air damper / economizer on hvac unit | $6,022 | $6,480 |
$6,022
50,233
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,546 | $16,462 |
$3,546
29,579
kWh
|
- | - | |
05 | 2.7132: Install timers on light switches in little used areas | $936 | $1,950 |
$828
6,905
kWh
|
$109
-
kW-mo/yr
|
- | |
06 | 2.7444: Close holes and openings in building such as broken windows | $520 | $618 | - | - |
$520
-
MMBtu
|
|
TOTAL RECOMMENDED | $33,906 | $111,208 |
$24,486
217,022
kWh
|
$109
-
kW-mo/yr
|
$9,312
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs