ITAC Assessment: WM0146
ITAC logo
ITAC Assessment: WM0146
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Industrial Oils
NAICS 324191: Petroleum Lubricating Oil and Grease Manufacturing
SIC 2992: Lubricating Oils and Greases
Sales Range $500
k
to 1
M
# of Employees 30
Plant Area 25,000
ft2
Annual Production 10,000
units
Production Hrs. Annual 2,625
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,730 256,282
kWh
Electricity Demand $4,614 672
kW-mo/yr
Electricity Fees $1,547 -
Natural Gas $59,360 10,219
MMBtu
Waste Disposal Costs
Water Usage $2,298 269
Tgal
TOTAL YEARLY COSTS $98,549
RECOMMENDED SAVINGS* $33,906 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $14,090 $69,698 $14,090
130,305
kWh
- -
02 2.2414: Use waste heat from hot flue gases to preheat $8,792 $16,000 - - $8,792
-
MMBtu
03 2.7241: Install outside air damper / economizer on hvac unit $6,022 $6,480 $6,022
50,233
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,546 $16,462 $3,546
29,579
kWh
- -
05 2.7132: Install timers on light switches in little used areas $936 $1,950 $828
6,905
kWh
$109
-
kW-mo/yr
-
06 2.7444: Close holes and openings in building such as broken windows $520 $618 - - $520
-
MMBtu
TOTAL RECOMMENDED $33,906 $111,208 $24,486
217,022
kWh
$109
-
kW-mo/yr
$9,312
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs