| Assessment Year | 2022 |
|---|---|
| Principal Product | Lumber |
| NAICS | 321113: Sawmills |
| SIC | 2451: Mobile Homes |
| Sales Range | $50 M to 100M |
| # of Employees | 175 |
| Plant Area |
3,484,800
ft2
|
| Annual Production | 60,000
thousand feet
|
| Production Hrs. Annual | 2,600
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $280,448 | 6,680,654 |
kWh
|
$0.042 |
| Electricity Demand | $332,887 | 31,972 |
kW-mo/yr
|
$10.41 |
| Electricity Fees | $93,309 | - |
|
- |
| TOTAL YEARLY COSTS | $706,644 | |||
| RECOMMENDED SAVINGS* | $5,196,489 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $10,233 | - |
$3,342
72,612
kWh
|
$6,891
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $8,881 | - |
$5,431
118,023
kWh
|
$3,450
-
kW-mo/yr
|
- | - | - | |
| 03 | 3.1191: Change procedures / equipment / operating conditions | $4,555 | - |
$4,555
98,987
kWh
|
- | - | - | - | |
| 04 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $1,507,357 | $45,058 | - | - | - | $5,760 | $1,501,597 | |
| 05 | 2.4239: Eliminate or reduce compressed air usage | $10,503 | $23,536 |
$10,503
228,235
kWh
|
- | - | - | - | |
| 06 | 2.3212: Optimize plant power factor | $13,297 | $55,141 | - | - | $13,297 | - | - | |
| 07 | 2.1224: Replace boiler | $3,641,663 | $6,124,080 |
$4,689,720
62,529,595
kWh
|
- | $706,645 | - | $(-1,754,702.0) | |
| TOTAL RECOMMENDED | $5,196,489 | $6,247,815 |
$4,713,551
63,047,452
kWh
|
$10,341
-
kW-mo/yr
|
$719,942 | $5,760 | $(-253,105.0) | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs