Assessment Year | 2022 |
---|---|
Principal Product | Lumber |
NAICS | 321113: Sawmills |
SIC | 2451: Mobile Homes |
Sales Range | $50 M to 100M |
# of Employees | 175 |
Plant Area |
3,484,800
ft2
|
Annual Production | 60,000
thousand feet
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $280,448 | 6,680,654 |
kWh
|
$0.042 |
Electricity Demand | $332,887 | 31,972 |
kW-mo/yr
|
$10.41 |
Electricity Fees | $93,309 | - |
|
- |
TOTAL YEARLY COSTS | $706,644 | |||
RECOMMENDED SAVINGS* | $5,196,489 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $10,233 | - |
$3,342
72,612
kWh
|
$6,891
-
kW-mo/yr
|
- | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $8,881 | - |
$5,431
118,023
kWh
|
$3,450
-
kW-mo/yr
|
- | - | - | |
03 | 3.1191: Change procedures / equipment / operating conditions | $4,555 | - |
$4,555
98,987
kWh
|
- | - | - | - | |
04 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $1,507,357 | $45,058 | - | - | - | $5,760 | $1,501,597 | |
05 | 2.4239: Eliminate or reduce compressed air usage | $10,503 | $23,536 |
$10,503
228,235
kWh
|
- | - | - | - | |
06 | 2.3212: Optimize plant power factor | $13,297 | $55,141 | - | - | $13,297 | - | - | |
07 | 2.1224: Replace boiler | $3,641,663 | $6,124,080 |
$4,689,720
62,529,595
kWh
|
- | $706,645 | - | $(-1,754,702.0) | |
TOTAL RECOMMENDED | $5,196,489 | $6,247,815 |
$4,713,551
63,047,452
kWh
|
$10,341
-
kW-mo/yr
|
$719,942 | $5,760 | $(-253,105.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs