ITAC Assessment: OR0755
ITAC logo
ITAC Assessment: OR0755
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Lumber
NAICS 321113: Sawmills
SIC 2451: Mobile Homes
Sales Range $50
M
to 100
M
# of Employees 175
Plant Area 3,484,800
ft2
Annual Production 60,000
thousand feet
Production Hrs. Annual 2,600
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $280,448 6,680,654
kWh
Electricity Demand $332,887 31,972
kW-mo/yr
Electricity Fees $93,309 -
TOTAL YEARLY COSTS $706,644
RECOMMENDED SAVINGS* $5,196,489 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Administrative Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $10,233 - $3,342
72,612
kWh
$6,891
-
kW-mo/yr
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $8,881 - $5,431
118,023
kWh
$3,450
-
kW-mo/yr
- - -
03 3.1191: Change procedures / equipment / operating conditions $4,555 - $4,555
98,987
kWh
- - - -
04 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $1,507,357 $45,058 - - - $5,760 $1,501,597
05 2.4239: Eliminate or reduce compressed air usage $10,503 $23,536 $10,503
228,235
kWh
- - - -
06 2.3212: Optimize plant power factor $13,297 $55,141 - - $13,297 - -
07 2.1224: Replace boiler $3,641,663 $6,124,080 $4,689,720
62,529,595
kWh
- $706,645 - $(-1,754,702.0)
TOTAL RECOMMENDED $5,196,489 $6,247,815 $4,713,551
63,047,452
kWh
$10,341
-
kW-mo/yr
$719,942 $5,760 $(-253,105.0)
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs