ITAC Assessment: MS0181
ITAC logo
ITAC Assessment: MS0181
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Upholstered Furniture
NAICS
n/a
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $10
M
to 50
M
# of Employees 267
Plant Area 448,000
ft2
Annual Production 150,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $114,229 3,128,408
kWh
Electricity Demand $114,834 11,231
kW-mo/yr
Electricity Fees $(-2,527.0) -
Natural Gas $41,833 5,157
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,090 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $672

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.4221: Install compressor air intakes in coolest locations $282 $107 $96
2,626
kWh
$182
-
kW-mo/yr
$4 - -
02 2.4314: Use synthetic lubricant $177 $132 $109
2,984
kWh
- $2 - $66
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $672 $104 $662
18,164
kWh
- $10 - -
04 2.4226: Use / purchase optimum sized compressor $2,627 - - $2,588
-
kW-mo/yr
$39 - -
05 2.2437: Recover waste heat from equipment $1,332 $2,100 - - - $1,332
-
MMBtu
-
TOTAL RECOMMENDED $5,090 $2,443 $867
23,774
kWh
$2,770
-
kW-mo/yr
$55 $1,332
-
MMBtu
$66
TOTAL IMPLEMENTED $672 $104 $662
18,164
kWh
- $10 - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs