ITAC Assessment: SF0503
ITAC logo
ITAC Assessment: SF0503
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Treated Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $100
M
to 500
M
# of Employees 400
Plant Area 585,000
ft2
Annual Production 22,500,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,299,810 31,639,715
kWh
Electricity Demand $1,437,780 60,060
kW-mo/yr
Natural Gas $3,826 1,084
MMBtu
TOTAL YEARLY COSTS $4,741,416
RECOMMENDED SAVINGS* $977,035 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $977,035

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2692: Use outside cold water source as a supply of cooling water $8,497 $7,120 $6,464
61,981
kWh
$2,033
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $123,711 $243,952 $85,375
818,627
kWh
$30,288
-
kW-mo/yr
$11,395 $(-3,347.0)
03 2.4322: Use or replace with energy efficient substitutes $802,468 $1,600,000 $610,565
5,854,494
kWh
$191,903
-
kW-mo/yr
- -
04 2.4133: Use most efficient type of electric motors $38,530 $102,500 $28,844
276,574
kWh
$9,686
-
kW-mo/yr
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,829 $29,980 $3,829
50,317
kWh
- - -
TOTAL RECOMMENDED $977,035 $1,983,552 $735,077
7,061,993
kWh
$233,910
-
kW-mo/yr
$11,395 $(-3,347.0)
TOTAL IMPLEMENTED $977,035 $1,983,552 $735,077
7,061,993
kWh
$233,910
-
kW-mo/yr
$11,395 $(-3,347.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs