| Assessment Year | 2017 |
|---|---|
| Principal Product | Treated Wastewater |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | $100 M to 500M |
| # of Employees | 400 |
| Plant Area |
585,000
ft2
|
| Annual Production | 22,500,000
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $3,299,810 | 31,639,715 |
kWh
|
$0.10 |
| Electricity Demand | $1,437,780 | 60,060 |
kW-mo/yr
|
$23.94 |
| Natural Gas | $3,826 | 1,084 |
MMBtu
|
$3.53 |
| TOTAL YEARLY COSTS | $4,741,416 | |||
| RECOMMENDED SAVINGS* | $977,035 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $977,035 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2692: Use outside cold water source as a supply of cooling water | $8,497 | $7,120 |
$6,464
61,981
kWh
|
$2,033
-
kW-mo/yr
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $123,711 | $243,952 |
$85,375
818,627
kWh
|
$30,288
-
kW-mo/yr
|
$11,395 | $(-3,347.0) | |
| 03 | 2.4322: Use or replace with energy efficient substitutes | $802,468 | $1,600,000 |
$610,565
5,854,494
kWh
|
$191,903
-
kW-mo/yr
|
- | - | |
| 04 | 2.4133: Use most efficient type of electric motors | $38,530 | $102,500 |
$28,844
276,574
kWh
|
$9,686
-
kW-mo/yr
|
- | - | |
| 05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,829 | $29,980 |
$3,829
50,317
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $977,035 | $1,983,552 |
$735,077
7,061,993
kWh
|
$233,910
-
kW-mo/yr
|
$11,395 | $(-3,347.0) | ||
| TOTAL IMPLEMENTED | $977,035 | $1,983,552 |
$735,077
7,061,993
kWh
|
$233,910
-
kW-mo/yr
|
$11,395 | $(-3,347.0) | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs