ITAC Assessment: OK1048
ITAC logo
ITAC Assessment: OK1048
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Synthetic petroleum based polymers
NAICS 325211: Plastics Material and Resin Manufacturing
SIC 2999: Products of Petroleum and Coal, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 95
Plant Area 190,000
ft2
Annual Production 25,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $662,185 13,243,690
kWh
Electricity Demand $182,885 25,507
kW-mo/yr
Natural Gas $987,834 371,366
MMBtu
Waste Disposal Costs
Water Usage $139,034 15,414
Tgal
TOTAL YEARLY COSTS $1,971,938
RECOMMENDED SAVINGS* $71,220 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $47,773

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2135: Repair and eliminate steam leaks $37,041 $2,860 - - - $37,041
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $8,475 $13,356 $8,475
169,494
kWh
- - -
03 2.7135: Install occupancy sensors $2,257 $3,150 $1,500
29,994
kWh
$757
-
kW-mo/yr
- -
04 2.7232: Replace existing hvac unit with high efficiency model $1,153 $4,000 $1,153
23,058
kWh
- - -
05 2.3212: Optimize plant power factor $22,294 $15,000 - - $22,294 -
TOTAL RECOMMENDED $71,220 $38,366 $11,128
222,546
kWh
$757
-
kW-mo/yr
$22,294 $37,041
-
MMBtu
TOTAL IMPLEMENTED $47,773 $19,366 $9,975
199,488
kWh
$757
-
kW-mo/yr
- $37,041
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs