Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,443

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Petroleum refining and related industries
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0272 #11 Y:2025 Optimize plant power factor $1,250 $11,200
UU0272 #10 Y:2025 Pay bills on time to avoid late fees $1,500 $600
UU0272 #09 Y:2025 Use solar heat to make electricty $18,600 $207,000
UU0272 #08 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $890 $410
UU0272 #07 Y:2025 Repair and eliminate steam leaks $62,900 $32,400
UU0272 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $4,170 $26,600
UU0272 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $9,950 $23,600
UU0272 #04 Y:2025 Use heat from boiler blowdown to preheat boiler feed water $54,700 $110,000
UU0272 #03 Y:2025 Reduce excessive boiler blowdown $20,800 $16,300
UU0272 #02 Y:2025 Insulate bare equipment $31,500 $18,800
UU0272 #01 Y:2025 Hire energy manager $66,000 $13,000
WV0677 #09 Y:2025 Insulate bare equipment $290 $446
WV0677 #08 Y:2025 Eliminate or reduce compressed air usage $1,244 $540
WV0677 #07 Y:2025 Develop a repair/replace policy $2,517 $12,170
WV0677 #06 Y:2025 Use flue gases to heat process or service water $3,254 $14,320
WV0677 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $6,687 $1,418
WV0677 #04 Y:2025 Establish a predictive maintenance program $7,107 $5,200
WV0677 #03 Y:2025 Upgrade controls on compressors $10,271 $5,515
WV0677 #02 Y:2025 Install occupancy sensors $15,762 $7,782
WV0677 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $19,491 $60,024