ITAC Assessment: UC2611
ITAC logo
ITAC Assessment: UC2611
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Hot Mix Asphalt
NAICS 324121: Asphalt Paving Mixture and Block Manufacturing
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $1
M
to 5
M
# of Employees 5
Plant Area 255,864
ft2
Annual Production 125,058
units
Production Hrs. Annual 3,120
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $17,534 116,360
kWh
Electricity Demand $21,477 1,031
kW-mo/yr
Electricity Fees $6,075 -
LPG $175,740 15,275
MMBtu
Fuel Oil #2 $100,972 4,428
MMBtu
TOTAL YEARLY COSTS $321,797
RECOMMENDED SAVINGS* $16,700 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings
01 2.8121: Apply for tax-free status for energy purchases $2,229 - - - $2,229 -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $113 $224 $113
750
kWh
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $478 $88 $311
2,066
kWh
$167
-
kW-mo/yr
- -
04 2.6126: Keep solid fuels / raw materials dry $13,880 $100,000 - - - $13,880
-
MMBtu
TOTAL RECOMMENDED $16,700 $100,312 $424
2,816
kWh
$167
-
kW-mo/yr
$2,229 $13,880
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs