Assessment Year | 1996 |
---|---|
Principal Product | Printed Wood Grain Paper |
NAICS |
n/a
|
SIC | 2671: Packaging Paper and Plastics Film, Coated and Laminated |
Sales Range | $50 M to 100M |
# of Employees | 140 |
Plant Area |
200,000
ft2
|
Annual Production | 823,000
thousand feet
|
Production Hrs. Annual | 8,424
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $262,592 | 10,674,385 |
kWh
|
$0.025 |
Electricity Demand | $303,875 | 25,344 |
kW-mo/yr
|
$11.99 |
Electricity Fees | $51,831 | - |
|
- |
Natural Gas | $385,330 | 99,436 |
MMBtu
|
$3.88 |
Fuel Oil #2 | $39,702 | 8,350 |
MMBtu
|
$4.75 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $129,554 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2612: Use cooling tower water instead of refrigeration | $9,934 | $5,000 |
$9,520
337,046
kWh
|
- | $414 | - | - | - | |
02 | 2.1212: Operate boilers on high fire setting | $8,380 | $2,000 | - | - | - |
$8,380
-
MMBtu
|
- | - | |
03 | 3.4151: Minimize water usage | $62,640 | - | - | - | - | - |
$31,320
-
Tgal
|
$31,320 | |
04 | 2.7241: Install outside air damper / economizer on hvac unit | $9,570 | $75,450 |
$9,114
370,457
kWh
|
- | $456 | - | - | - | |
05 | 2.4225: Install common header on compressors | $29,270 | $96,000 |
$17,030
692,263
kWh
|
$10,846
-
kW-mo/yr
|
$1,394 | - | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,760 | $48,450 |
$5,454
221,571
kWh
|
$3,844
-
kW-mo/yr
|
$462 | - | - | - | |
TOTAL RECOMMENDED | $129,554 | $226,900 |
$41,118
1,621,337
kWh
|
$14,690
-
kW-mo/yr
|
$2,726 |
$8,380
-
MMBtu
|
$31,320
-
Tgal
|
$31,320 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs