ITAC Assessment: NT0062
ITAC logo
ITAC Assessment: NT0062
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Asphalt
NAICS 324121: Asphalt Paving Mixture and Block Manufacturing
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $5
M
to 10
M
# of Employees 3
Plant Area 145,725
ft2
Annual Production 83,360
ton
Production Hrs. Annual 2,346
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,799 482,400
kWh
Electricity Demand $58,186 5,903
kW-mo/yr
Electricity Fees $1,058 -
Fuel Oil #4 $447,562 36,323
MMBtu
Other Gas $127,934 5,934
MMBtu
TOTAL YEARLY COSTS $664,538
RECOMMENDED SAVINGS* $87,940 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #4 Savings One-time Revenue or Avoided Cost Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $40,676 $1,258 - - - $40,676
-
MMBtu
-
02 2.4157: Establish a predictive maintenance program $22,401 $5,610 $919
14,876
kWh
- - - $21,482
03 2.3212: Optimize plant power factor $15,298 $28,001 - $15,298
-
kW-mo/yr
- - -
04 2.8121: Apply for tax-free status for energy purchases $7,323 $2,010 - - $7,323 - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,440 $4,895 $793
12,834
kWh
$647
-
kW-mo/yr
- - -
06 2.7221: Lower temperature during the winter season and vice-versa $803 - $803
12,992
kWh
- - - -
TOTAL RECOMMENDED $87,940 $41,773 $2,514
40,702
kWh
$15,945
-
kW-mo/yr
$7,323 $40,676
-
MMBtu
$21,482
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #4 Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs