Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

801

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Chemicals and chemical preparations, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IP0121 #03 Y:2019 Lower temperature during the winter season and vice-versa $1,721 $260
IP0121 #02 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $662 $23
IP0121 #01 Y:2019 Reduce the pressure of compressed air to the minimum required $1,409 $5
UF0532 #07 Y:2019 Reduce or eliminate waste $19,196 $40,500
UF0532 #06 Y:2019 Insulate bare equipment $1,094 $230
UF0532 #05 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $1,301 $421
UF0532 #04 Y:2019 Install adequate dryers on air lines to eliminate blowdown $1,403 $5,998
UF0532 #03 Y:2019 Use most efficient type of electric motors $9,352 $25,847
UF0532 #02 Y:2019 Analyze flue gas for proper air/fuel ratio $23,919 $1,400
UF0532 #01 Y:2019 Recover waste heat from equipment $40,174 $25,000
UF0530 #09 Y:2019 Redesign flow to minimize mass transfer length $1,181 $2,000
UF0530 #08 Y:2019 Install adequate dryers on air lines to eliminate blowdown $1,535 $5,998
UF0530 #07 Y:2019 Eliminate leaks in inert gas and compressed air lines/ valves $1,876 $421
UF0530 #06 Y:2019 Utilize energy-efficient belts and other improved mechanisms $3,402 -
UF0530 #05 Y:2019 Use adjustable frequency drive or multiple speed motors on existing system $5,859 $22,491
UF0530 #04 Y:2019 Recover waste heat from equipment $43,693 $25,000
UF0530 #03 Y:2019 Recover waste heat from equipment $47,739 $25,000
UF0530 #02 Y:2019 Use most efficient type of electric motors $60,494 $202,420
UF0530 #01 Y:2019 Utilize controls to operate equipment only when needed $94,823 $80,000
TT0217 #04 Y:2018 Insulate bare equipment $3,136 $1,541