801
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Chemicals and chemical preparations, not elsewhere classified | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| IP0121 #03 Y:2019 | 03 | 2019 | Lower temperature during the winter season and vice-versa | $1,721 | $260 | |
| IP0121 #02 Y:2019 | 02 | 2019 | Eliminate leaks in inert gas and compressed air lines/ valves | $662 | $23 | |
| IP0121 #01 Y:2019 | 01 | 2019 | Reduce the pressure of compressed air to the minimum required | $1,409 | $5 | |
| UF0532 #07 Y:2019 | 07 | 2019 | Reduce or eliminate waste | $19,196 | $40,500 | |
| UF0532 #06 Y:2019 | 06 | 2019 | Insulate bare equipment | $1,094 | $230 | |
| UF0532 #05 Y:2019 | 05 | 2019 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,301 | $421 | |
| UF0532 #04 Y:2019 | 04 | 2019 | Install adequate dryers on air lines to eliminate blowdown | $1,403 | $5,998 | |
| UF0532 #03 Y:2019 | 03 | 2019 | Use most efficient type of electric motors | $9,352 | $25,847 | |
| UF0532 #02 Y:2019 | 02 | 2019 | Analyze flue gas for proper air/fuel ratio | $23,919 | $1,400 | |
| UF0532 #01 Y:2019 | 01 | 2019 | Recover waste heat from equipment | $40,174 | $25,000 | |
| UF0530 #09 Y:2019 | 09 | 2019 | Redesign flow to minimize mass transfer length | $1,181 | $2,000 | |
| UF0530 #08 Y:2019 | 08 | 2019 | Install adequate dryers on air lines to eliminate blowdown | $1,535 | $5,998 | |
| UF0530 #07 Y:2019 | 07 | 2019 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,876 | $421 | |
| UF0530 #06 Y:2019 | 06 | 2019 | Utilize energy-efficient belts and other improved mechanisms | $3,402 | - | |
| UF0530 #05 Y:2019 | 05 | 2019 | Use adjustable frequency drive or multiple speed motors on existing system | $5,859 | $22,491 | |
| UF0530 #04 Y:2019 | 04 | 2019 | Recover waste heat from equipment | $43,693 | $25,000 | |
| UF0530 #03 Y:2019 | 03 | 2019 | Recover waste heat from equipment | $47,739 | $25,000 | |
| UF0530 #02 Y:2019 | 02 | 2019 | Use most efficient type of electric motors | $60,494 | $202,420 | |
| UF0530 #01 Y:2019 | 01 | 2019 | Utilize controls to operate equipment only when needed | $94,823 | $80,000 | |
| TT0217 #04 Y:2018 | 04 | 2018 | Insulate bare equipment | $3,136 | $1,541 |