ITAC Assessment: TT0217
ITAC logo
ITAC Assessment: TT0217
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Plastic Compounds
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 110
Plant Area 113,500
ft2
Annual Production 77,396
ton
Production Hrs. Annual 8,424
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,389,950 38,320,917
kWh
Electricity Demand $626,249 66,916
kW-mo/yr
Natural Gas $118,811 14,385
MMBtu
Waste Disposal Costs
Water Usage $83,181 28,497,400
Tgal
Water Disposal $108,187 28,497
Tgal
TOTAL YEARLY COSTS $2,326,378
RECOMMENDED SAVINGS* $86,349 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $50,350

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Primary Product Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $35,999 $37,500 $26,329
725,306
kWh
$9,670
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $29,903 $25,280 - - - $29,903
03 3.4115: Recover and reuse cooling water $17,311 $400 - - $17,311
-
Tgal
-
04 2.2511: Insulate bare equipment $3,136 $1,541 $3,136
86,400
kWh
- - -
TOTAL RECOMMENDED $86,349 $64,721 $29,465
811,706
kWh
$9,670
-
kW-mo/yr
$17,311
-
Tgal
$29,903
TOTAL IMPLEMENTED $50,350 $27,221 $3,136
86,400
kWh
- $17,311
-
Tgal
$29,903
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs