ITAC Assessment: NC0041
ITAC logo
ITAC Assessment: NC0041
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Air Purification Equipment
NAICS
n/a
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 67
Plant Area 134,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,116 1,310,375
kWh
Natural Gas $14,114 2,563
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,091 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,664

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,492 $300 $1,492
24,912
kWh
-
02 2.7243: Improve air circulation with destratification fans / other methods $7,252 $15,600 - $7,252
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,145 $926 $1,145
18,464
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,005 $14,685 $3,005
80,012
kWh
-
05 2.7111: Reduce illumination to minimum necessary levels $2,282 $500 $2,282
36,928
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $190 $2,000 $190
3,224
kWh
-
07 2.4133: Use most efficient type of electric motors $725 $1,060 $725
11,723
kWh
-
TOTAL RECOMMENDED $16,091 $35,071 $8,839
175,263
kWh
$7,252
-
MMBtu
TOTAL IMPLEMENTED $12,664 $33,645 $5,412
119,871
kWh
$7,252
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs