Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

765

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Paints, varnishes, lacquers, enamels, and allied
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0337 #09 Y:2025 Recover waste heat from equipment $2,714 $5,000
TT0337 #08 Y:2025 Establish a predictive maintenance program $108,000 $12,300
TT0337 #07 Y:2025 Use optimum size and capacity equipment $2,382 $16,500
TT0337 #06 Y:2025 Improve combustion control capability $2,372 $1,000
TT0337 #05 Y:2025 Utilize higher efficiency lamps and/or ballasts $5,274 $12,000
TT0337 #04 Y:2025 Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $210 $500
TT0337 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $6,154 $1,570
TT0337 #02 Y:2025 Convert to oxyfuel burners $37,798 $25,000
TT0337 #01 Y:2025 Use insulation in furnaces to facilitate heating / cooling $1,309 $1,884
OR0807 #04 Y:2025 Replace hydraulic / pneumatic equipment with electric equipment $3,635 $16,079
OR0807 #03 Y:2025 Reduce the pressure of compressed air to the minimum required $753 $2,323
OR0807 #02 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $2,721 $7,534
OR0807 #01 Y:2025 Utilize higher efficiency lamps and/or ballasts $8,168 $10,530
WM0225 #05 Y:2024 Utilize energy-efficient belts and other improved mechanisms $1,246 $1,375
WM0225 #04 Y:2024 Recharge batteries on during off-peak demand periods $3,687 $4,037
WM0225 #03 Y:2024 Install compressor air intakes in coolest locations $6,067 $5,244
WM0225 #02 Y:2024 Reduce the pressure of compressed air to the minimum required $25,176 -
WM0225 #01 Y:2024 Preheat combustion air with waste heat $43,885 $200,000
UD1089 #06 Y:2024 Use waste heat from hot flue gases to preheat $6,228 $27,650
UD1089 #05 Y:2024 Install occupancy sensors $472 $550