ITAC Assessment: OR0807
ITAC logo
ITAC Assessment: OR0807
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Emulsions
NAICS 325510: Paint and Coating Manufacturing
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $10
M
to 50
M
# of Employees 11
Plant Area 79,880
ft2
Annual Production 19,000,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,781 371,640
kWh
Electricity Demand $43,593 2,195
kW-mo/yr
Electricity Fees $6,537 -
Natural Gas $74,572 8,579
MMBtu
LPG $5,061 96
MMBtu
Waste Disposal Costs
Water Usage $10,680 1,104
Tgal
Water Disposal $19,004 1,106
Tgal
TOTAL YEARLY COSTS $189,228
RECOMMENDED SAVINGS* $15,277 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,168 $10,530 $2,028
25,313
kWh
$2,930
-
kW-mo/yr
$3,210
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,721 $7,534 $1,054
13,149
kWh
$1,667
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $753 $2,323 $346
4,323
kWh
$407
-
kW-mo/yr
-
04 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $3,635 $16,079 $3,635
45,362
kWh
- -
TOTAL RECOMMENDED $15,277 $36,466 $7,063
88,147
kWh
$5,004
-
kW-mo/yr
$3,210
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs