Assessment Year | 2025 |
---|---|
Principal Product | Emulsions |
NAICS | 325510: Paint and Coating Manufacturing |
SIC | 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products |
Sales Range | $10 M to 50M |
# of Employees | 11 |
Plant Area |
79,880
ft2
|
Annual Production | 19,000,000
lb
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $29,781 | 371,640 |
kWh
|
$0.080 | |
Electricity Demand | $43,593 | 2,195 |
kW-mo/yr
|
$19.86 | |
Electricity Fees | $6,537 | - |
|
- | |
Natural Gas | $74,572 | 8,579 |
MMBtu
|
$8.69 | |
LPG | $5,061 | 96 |
MMBtu
|
$52.72 | |
Waste Disposal Costs | |||||
Water Usage | $10,680 | 1,104 |
Tgal
|
$9.67 | |
Water Disposal | $19,004 | 1,106 |
Tgal
|
$17.19 | |
TOTAL YEARLY COSTS | $189,228 | ||||
RECOMMENDED SAVINGS* | $15,277 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,168 | $10,530 |
$2,028
25,313
kWh
|
$2,930
-
kW-mo/yr
|
$3,210 | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,721 | $7,534 |
$1,054
13,149
kWh
|
$1,667
-
kW-mo/yr
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $753 | $2,323 |
$346
4,323
kWh
|
$407
-
kW-mo/yr
|
- | |
04 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $3,635 | $16,079 |
$3,635
45,362
kWh
|
- | - | |
TOTAL RECOMMENDED | $15,277 | $36,466 |
$7,063
88,147
kWh
|
$5,004
-
kW-mo/yr
|
$3,210 | ||
TOTAL IMPLEMENTED | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs