ITAC Assessment: AM0578
ITAC logo
ITAC Assessment: AM0578
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Reclosable plastic bags
NAICS 326111: Plastics Bag and Pouch Manufacturing
SIC 2673: Plastics, Foil, and Coated Paper Bags
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 65,000
ft2
Annual Production 8,500,000
lb
Production Hrs. Annual 8,616
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $343,034 4,332,000
kWh
Electricity Demand $22,045 7,248
kW-mo/yr
Electricity Fees $2,483 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,809 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,879

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $20,330 $22,600 $19,500
247,000
kWh
$830
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $12,825 $700 $12,300
155,700
kWh
$525
-
kW-mo/yr
-
03 2.2511: Insulate bare equipment $4,700 $560 $4,700
59,500
kWh
- -
04 2.2522: Isolate hot or cold equipment $4,650 $6,280 $4,650
58,815
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $4,170 $40 $4,000
50,600
kWh
$170
-
kW-mo/yr
-
06 2.7134: Use photocell controls $2,470 $20 $2,280
28,900
kWh
$190
-
kW-mo/yr
-
07 2.4314: Use synthetic lubricant $1,570 - $1,505
19,080
kWh
$65
-
kW-mo/yr
-
08 2.7124: Make a practice of turning off lights when not needed $1,054 - $1,010
12,800
kWh
$44
-
kW-mo/yr
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,040 $470 $230
2,900
kWh
$10
-
kW-mo/yr
$800
TOTAL RECOMMENDED $52,809 $30,670 $50,175
635,295
kWh
$1,834
-
kW-mo/yr
$800
TOTAL IMPLEMENTED $13,879 $700 $13,310
168,500
kWh
$569
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs