ITAC Assessment: WM0225
ITAC logo
ITAC Assessment: WM0225
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Paint and Coatings
NAICS 325510: Paint and Coating Manufacturing
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $50
M
to 100
M
# of Employees 500
Plant Area 530,000
ft2
Annual Production 286,134,605
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,439,047 35,611,516
kWh
Electricity Demand $960,355 57,198
kW-mo/yr
Electricity Fees $(-99,504.0) -
Natural Gas $907,932 307,122
MMBtu
TOTAL YEARLY COSTS $4,207,830
RECOMMENDED SAVINGS* $80,061 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2442: Preheat combustion air with waste heat $43,885 $200,000 - - - $43,885
-
MMBtu
02 2.4231: Reduce the pressure of compressed air to the minimum required $25,176 - $18,796
276,405
kWh
$6,380
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $6,067 $5,244 $4,530
66,620
kWh
$1,536
-
kW-mo/yr
- -
04 2.3132: Recharge batteries on during off-peak demand periods $3,687 $4,037 - - $3,687 -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,246 $1,375 $931
13,686
kWh
$316
-
kW-mo/yr
- -
TOTAL RECOMMENDED $80,061 $210,656 $24,256
356,711
kWh
$8,232
-
kW-mo/yr
$3,687 $43,885
-
MMBtu
TOTAL IMPLEMENTED - - - - - -