503
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Perfumes, cosmetics, and other toilet preparations | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| HO0125 #01 Y:1995 | 01 | 1995 | Install compressor air intakes in coolest locations | $3,210 | $1,200 | |
| HO0122 #04 Y:1995 | 04 | 1995 | Install occupancy sensors | $1,151 | $400 | |
| HO0122 #03 Y:1995 | 03 | 1995 | Remove or close off unneeded compressed air lines | $1,952 | $750 | |
| HO0122 #02 Y:1995 | 02 | 1995 | Make a practice of turning off lights when not needed | $332 | - | |
| HO0122 #01 Y:1995 | 01 | 1995 | Use most efficient type of electric motors | $773 | $1,733 | |
| HO0117 #07 Y:1995 | 07 | 1995 | Replace city water with recycled water via cooling tower | $5,610 | $4,000 | |
| HO0117 #06 Y:1995 | 06 | 1995 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,328 | $250 | |
| HO0117 #05 Y:1995 | 05 | 1995 | Remove or close off unneeded compressed air lines | $1,237 | $500 | |
| HO0117 #04 Y:1995 | 04 | 1995 | Install / repair insulation on steam lines | $383 | $513 | |
| HO0117 #03 Y:1995 | 03 | 1995 | Keep boiler tubes clean | $5,227 | $220 | |
| HO0117 #02 Y:1995 | 02 | 1995 | Utilize higher efficiency lamps and/or ballasts | $2,814 | $7,694 | |
| HO0117 #01 Y:1995 | 01 | 1995 | Utilize higher efficiency lamps and/or ballasts | $3,238 | $2,300 | |
| MO0160 #09 Y:1995 | 09 | 1995 | Eliminate/reduce an operation | $4,040 | $8,000 | |
| MO0160 #08 Y:1995 | 08 | 1995 | Cover open tanks | $174 | $275 | |
| MO0160 #07 Y:1995 | 07 | 1995 | Install vinyl strip / high speed / air curtain doors | $1,480 | $2,330 | |
| MO0160 #06 Y:1995 | 06 | 1995 | Replace electrically-operated equipment with fossil fuel equipment | $690 | $1,430 | |
| MO0160 #05 Y:1995 | 05 | 1995 | Install compressor air intakes in coolest locations | $3,198 | $1,390 | |
| MO0160 #04 Y:1995 | 04 | 1995 | Analyze flue gas for proper air/fuel ratio | $1,771 | $1,195 | |
| MO0160 #03 Y:1995 | 03 | 1995 | Utilize higher efficiency lamps and/or ballasts | $322 | - | |
| MO0160 #02 Y:1995 | 02 | 1995 | Utilize energy-efficient belts and other improved mechanisms | $39 | - |