ITAC Assessment: KG0051
ITAC logo
ITAC Assessment: KG0051
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product liquid and leaf extract aloe
NAICS
n/a
SIC 2844: Perfumes, Cosmetics, and Other Toilet Preparations
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 52,800
ft2
Annual Production 31,768,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,383 1,515,240
kWh
Electricity Demand $52,150 3,696
kW-mo/yr
Electricity Fees $1,411 -
Natural Gas $40,415 16,261
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,959 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $5,350 $3,820 $3,308
105,803
kWh
$2,042
-
kW-mo/yr
- - -
02 2.7111: Reduce illumination to minimum necessary levels $4,473 $2,080 $2,763
88,218
kWh
$1,710
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,014 $1,052 $2,084
66,530
kWh
$1,930
-
kW-mo/yr
- - -
04 2.1233: Analyze flue gas for proper air/fuel ratio $2,751 $1,500 - - $2,751
-
MMBtu
- -
05 2.7261: Install timers and/or thermostats $1,859 $450 $1,859
59,496
kWh
- - - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,464 $1,120 $672
21,395
kWh
$792
-
kW-mo/yr
- - -
07 2.4314: Use synthetic lubricant $1,354 - $837
26,671
kWh
$517
-
kW-mo/yr
- - -
08 3.4151: Minimize water usage $27,720 $3,283 - - - $27,720
-
Tgal
-
09 3.5311: Recover and reuse waste material $2,930 $75 - - - - $2,930
-
lb
10 3.5311: Recover and reuse waste material $2,044 - - - - - $2,044
-
lb
TOTAL RECOMMENDED $53,959 $13,380 $11,523
368,113
kWh
$6,991
-
kW-mo/yr
$2,751
-
MMBtu
$27,720
-
Tgal
$4,974
-
lb
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs