ITAC Assessment: OR0610
ITAC logo
ITAC Assessment: OR0610
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Freeze Dried Food
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 84,620
ft2
Annual Production 3,858
units
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $778,749 15,424,774
kWh
Electricity Demand $242,732 30,039
kW-mo/yr
Electricity Fees $74,315 -
Natural Gas $192,648 39,253
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $266,611 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $64,511

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.1116: Improve combustion control capability $11,054 $11,584 $4,630
87,943
kWh
- $6,424
-
MMBtu
-
02 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $8,287 $11,998 $8,287
157,390
kWh
- - -
03 4.132: Purchase new equipment to reduce material use / cost $161,127 $238,200 $17,979
341,482
kWh
$3,948
-
kW-mo/yr
- $139,200
04 2.6218: Turn off equipment when not in use $1,406 $2,100 $1,406
25,002
kWh
- - -
05 2.2611: Moderate cooling tower outlet temperature $64,511 $85,275 $53,015
1,006,988
kWh
$11,496
-
kW-mo/yr
- -
06 2.4224: Upgrade controls on compressors $8,077 $26,477 $7,307
138,792
kWh
$770
-
kW-mo/yr
- -
07 2.2628: Utilize a less expensive cooling method $6,621 $24,248 $5,513
98,007
kWh
$1,108
-
kW-mo/yr
- -
08 2.2127: Flash condensate to produce lower pressure steam $4,383 $16,215 - - $4,383
-
MMBtu
-
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,145 $5,840 $1,145
21,748
kWh
- - -
TOTAL RECOMMENDED $266,611 $421,937 $99,282
1,877,352
kWh
$17,322
-
kW-mo/yr
$10,807
-
MMBtu
$139,200
TOTAL IMPLEMENTED $64,511 $85,275 $53,015
1,006,988
kWh
$11,496
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs