Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Cosmetics & Personal Hygiene Products
NAICS
n/a
SIC 2844: Perfumes, Cosmetics, and Other Toilet Preparations
Sales Range $5
M
to 10
M
# of Employees 45
Plant Area 30,000
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 2,375
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $13,713 165,885
kWh
Electricity Demand $16,469 813
kW-mo/yr
Natural Gas $544 344
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,488 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,932

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Primary Product Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,586 $10,740 $2,893
35,756
kWh
$693
-
kW-mo/yr
- - -
02 2.7134: Use photocell controls $1,321 $1,000 $1,076
13,189
kWh
$245
-
kW-mo/yr
- - -
03 2.7135: Install occupancy sensors $235 $480 $235
1,758
kWh
- - - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $417 $675 $330
4,103
kWh
$87
-
kW-mo/yr
- - -
05 2.4221: Install compressor air intakes in coolest locations $181 $260 $143
1,758
kWh
$38
-
kW-mo/yr
- - -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $338 $920 $347
4,396
kWh
$91
-
kW-mo/yr
$(-100.0)
-
MMBtu
- -
07 4.432: Cross-train personnel to avoid lost time $13,910 - - - - - $13,910
08 3.5315: Lease / purchase baler; sell cardboard to recycler $500 $200 - - - $500
-
lb
-
TOTAL RECOMMENDED $20,488 $14,275 $5,024
60,960
kWh
$1,154
-
kW-mo/yr
$(-100.0)
-
MMBtu
$500
-
lb
$13,910
TOTAL IMPLEMENTED $18,932 $12,795 $3,713
46,013
kWh
$909
-
kW-mo/yr
$(-100.0)
-
MMBtu
$500
-
lb
$13,910
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs