Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

179

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Specialty cleaning, polishing, and sanitation preparations
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IA0314 #06 Y:2002 Use adjustable frequency drive or multiple speed motors on existing system $2,549 $7,100
IA0314 #05 Y:2002 Use adjustable frequency drive or multiple speed motors on existing system $7,483 $26,776
IA0314 #04 Y:2002 Use most efficient type of electric motors $443 $238
IA0314 #03 Y:2002 Install compressor air intakes in coolest locations $766 $130
IA0314 #02 Y:2002 Reduce the pressure of compressed air to the minimum required $872 $30
IA0314 #01 Y:2002 Eliminate leaks in inert gas and compressed air lines/ valves $1,950 $267
WI0361 #06 Y:1999 Utilize energy-efficient belts and other improved mechanisms $649 -
WI0361 #05 Y:1999 Install equipment (eg compactor) to reduce disposal costs $894 -
WI0361 #04 Y:1999 Utilize higher efficiency lamps and/or ballasts $984 $3,740
WI0361 #03 Y:1999 Install compressor air intakes in coolest locations $3,555 $1,380
WI0361 #02 Y:1999 Modify refrigeration system to operate at a lower pressure $14,677 $45,000
WI0361 #01 Y:1999 Train operators for maximum operating efficiency $25,500 -
UF0225 #07 Y:1999 Not found $28,392 $115
UF0225 #06 Y:1999 Recover and reuse waste material $1,825 -
UF0225 #05 Y:1999 Install equipment (eg compactor) to reduce disposal costs $28,729 $25,000
UF0225 #04 Y:1999 Turn off equipment when not in use $912 -
UF0225 #03 Y:1999 Eliminate leaks in inert gas and compressed air lines/ valves $1,544 $1,000
UF0225 #02 Y:1999 Utilize daylight whenever possible in lieu of artificial light $8,490 $12,912
UF0225 #01 Y:1999 Reduce illumination to minimum necessary levels $9,814 $13,400
UF0229 #09 Y:1999 Utilize higher efficiency lamps and/or ballasts $1,977 $1,200