ITAC Assessment: IA0314
ITAC logo
ITAC Assessment: IA0314
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Institutional Cleaning Products
NAICS 325612: Polish and Other Sanitation Good Manufacturing
SIC 2842: Specialty Cleaning, Polishing, and Sanitation Preparations
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 130,000
ft2
Annual Production 12,000,000
lb
Production Hrs. Annual 3,640
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $136,754 3,877,200
kWh
Electricity Demand $104,856 10,908
kW-mo/yr
Electricity Fees $(-2,906.0) -
Natural Gas $164,675 32,179
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,554 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,756

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,950 $267 $1,282
36,317
kWh
$668
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $872 $30 $573
16,224
kWh
$299
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $766 $130 $370
10,487
kWh
$396
-
kW-mo/yr
-
04 2.4133: Use most efficient type of electric motors $443 $238 $205
5,812
kWh
$238
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,483 $26,776 $3,789
107,328
kWh
- $3,694
-
MMBtu
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,549 $7,100 $1,674
47,424
kWh
$875
-
kW-mo/yr
-
07 2.1213: Direct warmest air to combustion intake $491 $520 - - $491
-
MMBtu
TOTAL RECOMMENDED $14,554 $35,061 $7,893
223,592
kWh
$2,476
-
kW-mo/yr
$4,185
-
MMBtu
TOTAL IMPLEMENTED $3,756 $1,055 $2,060
58,353
kWh
$1,205
-
kW-mo/yr
$491
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs