Assessment Year | 2003 |
---|---|
Principal Product | Institutional Cleaning Products |
NAICS | 325612: Polish and Other Sanitation Good Manufacturing |
SIC | 2842: Specialty Cleaning, Polishing, and Sanitation Preparations |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
130,000
ft2
|
Annual Production | 12,000,000
lb
|
Production Hrs. Annual | 3,640
hrs
|
Location (State) | Minnesota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $136,754 | 3,877,200 |
kWh
|
$0.035 |
Electricity Demand | $104,856 | 10,908 |
kW-mo/yr
|
$9.61 |
Electricity Fees | $(-2,906.0) | - |
|
- |
Natural Gas | $164,675 | 32,179 |
MMBtu
|
$5.12 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $14,554 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,756 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,950 | $267 |
$1,282
36,317
kWh
|
$668
-
kW-mo/yr
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $872 | $30 |
$573
16,224
kWh
|
$299
-
kW-mo/yr
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $766 | $130 |
$370
10,487
kWh
|
$396
-
kW-mo/yr
|
- | |
04 | 2.4133: Use most efficient type of electric motors | $443 | $238 |
$205
5,812
kWh
|
$238
-
kW-mo/yr
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,483 | $26,776 |
$3,789
107,328
kWh
|
- |
$3,694
-
MMBtu
|
|
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,549 | $7,100 |
$1,674
47,424
kWh
|
$875
-
kW-mo/yr
|
- | |
07 | 2.1213: Direct warmest air to combustion intake | $491 | $520 | - | - |
$491
-
MMBtu
|
|
TOTAL RECOMMENDED | $14,554 | $35,061 |
$7,893
223,592
kWh
|
$2,476
-
kW-mo/yr
|
$4,185
-
MMBtu
|
||
TOTAL IMPLEMENTED | $3,756 | $1,055 |
$2,060
58,353
kWh
|
$1,205
-
kW-mo/yr
|
$491
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs